Circuito LVEG105

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación B B B B B B B B B B B B
Clientes 21836 21836 21809 21681 21630 21595 21517 21501 21413 21382 9740 21381
% Nivel Cobranza 0.00% 103.17% 94.06% 88.91% 100.31% 85.52% 98.44% 97.88% 97.48% 95.56% 104.03% 108.66%
% Nivel Pérdida 0.00% 33.22% 33.71% 40.25% 41.33% 36.35% 40.81% 31.75% 39.28% 25.82% 30.86% 36.48%
Energía Suministrada (GWh) 0 6.86 7.39 7.9 7.22 6.6 6.2 5.4 5.84 4.63 5.1 5.46
Energía Facturada (GWh) 0 4.58 4.9 4.72 4.24 4.2 3.67 3.69 3.54 3.43 3.53 3.47
Energía Cobrada (GWh) 0 4.72 4.61 4.2 4.25 3.59 3.61 3.61 3.45 3.28 3.67 3.77
% Servicio 98.87% 99.26% 99.55% 99.12% 99.48% 99.85% 99.53% 99.62% 99.88% 99.67% 99.98% 99.97%
% Sin Servicio 1.13% 0.74% 0.45% 0.88% 0.52% 0.15% 0.47% 0.38% 0.12% 0.33% 0.02% 0.03%
Interrupción Programada (Hrs) 0.00 5.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.25 5.42 3.31 6.46 3.82 1.09 3.46 2.81 0.86 2.42 0.14 0.23
Promedio Interrupción Diarias (Hrs) 0.27 0.18 0.11 0.21 0.13 0.04 0.11 0.09 0.03 0.08 0.00 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Villa Francisca 1 Y 2, Los MultiS (San Miguel), La Primavera, La Lotería, Fundación Panal, Ana Magalis, Los Multis La Lotería, Barrio Lindo, Nápoles, La Riviera, Terrero, Quinto Patio, Estancia.