Buscar Circuitos Glosario

Circuito LUPR103CAM

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 754 754 750 750 738 735 739 735 736 734 719 715
% Nivel Cobranza 0.00% 92.16% 90.21% 84.16% 96.54% 81.58% 100.93% 83.91% 95.59% 95.68% 94.53% 94.53%
% Nivel Pérdida 0.00% 29.47% 31.63% 29.23% 35.62% 22.86% 34.82% 18.38% 25.14% 31.00% 31.08% 39.19%
Energía Suministrada (GWh) 0 0.18 0.18 0.16 0.16 0.14 0.14 0.12 0.14 0.15 0.15 0.17
Energía Facturada (GWh) 0 0.12 0.12 0.12 0.1 0.11 0.09 0.1 0.1 0.1 0.1 0.1
Energía Cobrada (GWh) 0 0.11 0.11 0.1 0.1 0.09 0.09 0.08 0.1 0.1 0.1 0.1
% Servicio 94.55% 92.35% 96.03% 93.65% 92.92% 93.09% 96.63% 95.82% 97.22% 98.43% 96.51% 99.49%
% Sin Servicio 5.45% 7.65% 3.97% 6.35% 7.08% 6.91% 3.37% 4.18% 2.78% 1.57% 3.49% 0.51%
Interrupción Programada (Hrs) 17.00 49.00 65.00 71.00 52.00 43.00 5.00 6.00 11.00 6.00 0.00 0.00
Interrupción Ejecutada (Hrs) 39.26 55.09 28.59 45.71 50.95 49.75 24.28 30.11 19.99 11.71 25.48 3.73
Promedio Interrupción Diarias (Hrs) 1.29 1.81 0.94 1.50 1.68 1.64 0.80 0.99 0.66 0.38 0.84 0.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LUPR103CAM
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.65
% Ejecución Operativa 0%
Detalle de Salidas - Circuito LUPR103CAM
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Ejecutada 13:38:15 13:53:31 0.25 REGULACION DE FRECUENCIA
20/10/2026 Ejecutada 19:32:02 19:48:01 0.27 DISPARO DESCONOCIDO
19/10/2026 Ejecutada 01:56:22 02:03:11 0.11 DISPARO DESCONOCIDO
18/10/2026 Ejecutada 04:03:23 04:14:54 0.19 DISPARO DESCONOCIDO
15/10/2026 Ejecutada 15:46:37 15:49:53 0.61 CAUSA DESCONOCIDA
15/10/2026 Ejecutada 15:03:47 15:32:41 0.61 CAUSA DESCONOCIDA
15/10/2026 Ejecutada 14:59:07 15:03:44 0.61 CAUSA DESCONOCIDA
El Cambiazo, Guzmancito, Palo Indio.