Circuito LUPR103CAM

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 738 738 735 739 735 736 734 719 715 714 711 707
% Nivel Cobranza 0.00% 96.54% 81.58% 100.93% 83.91% 95.59% 95.68% 94.53% 94.53% 92.94% 97.14% 96.61%
% Nivel Pérdida 0.00% 35.62% 22.86% 34.82% 18.38% 25.14% 31.00% 31.08% 39.19% 37.26% 36.21% 43.29%
Energía Suministrada (GWh) 0 0.16 0.14 0.14 0.12 0.14 0.15 0.15 0.17 0.16 0.16 0.17
Energía Facturada (GWh) 0 0.1 0.11 0.09 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Energía Cobrada (GWh) 0 0.1 0.09 0.09 0.08 0.1 0.1 0.1 0.1 0.1 0.1 0.09
% Servicio 93.65% 92.92% 93.09% 96.63% 95.82% 97.22% 98.43% 96.51% 99.49% 98.61% 93.87% 98.20%
% Sin Servicio 6.35% 7.08% 6.91% 3.37% 4.18% 2.78% 1.57% 3.49% 0.51% 1.39% 6.13% 1.80%
Interrupción Programada (Hrs) 71.00 52.00 43.00 5.00 6.00 11.00 6.00 0.00 0.00 0.00 28.00 30.00
Interrupción Ejecutada (Hrs) 45.71 50.95 49.75 24.28 30.11 19.99 11.71 25.48 3.73 10.14 44.76 13.16
Promedio Interrupción Diarias (Hrs) 1.50 1.68 1.64 0.80 0.99 0.66 0.38 0.84 0.12 0.33 1.47 0.43
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LUPR103CAM
Interrupciones Programadas 15
Interrupciones Ejecutadas 21.66
% Ejecución Operativa 144.40%
Detalle de Salidas - Circuito LUPR103CAM
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 13:00:00 18:00:00 5 DISPARO DESCONOCIDO
08/07/2026 Ejecutada 15:05:22 15:14:28 0.27 DISPARO DESCONOCIDO
08/07/2026 Ejecutada 13:11:06 13:14:46 0.27 DISPARO DESCONOCIDO
08/07/2026 Ejecutada 12:43:09 12:46:37 0.27 DISPARO DESCONOCIDO
07/07/2026 Ejecutada 17:02:18 17:06:35 0.62 DISPARO DESCONOCIDO // PODA CORRECTIVA // PODA PREVENTIVO
07/07/2026 Ejecutada 15:05:45 15:15:43 0.62 DISPARO DESCONOCIDO // PODA CORRECTIVA // PODA PREVENTIVO
07/07/2026 Ejecutada 11:40:12 11:43:31 0.62 DISPARO DESCONOCIDO // PODA CORRECTIVA // PODA PREVENTIVO
07/07/2026 Ejecutada 10:03:04 10:09:46 0.62 DISPARO DESCONOCIDO // PODA CORRECTIVA // PODA PREVENTIVO
07/07/2026 Ejecutada 07:43:16 07:56:27 0.62 DISPARO DESCONOCIDO // PODA CORRECTIVA // PODA PREVENTIVO
06/07/2026 Programada 12:00:00 17:00:00 5
05/07/2026 Ejecutada 11:02:43 11:07:14 0.17 CORRECTIVO EN CONDUCTOR SOTERRADO
05/07/2026 Ejecutada 10:13:19 10:18:52 0.17 CORRECTIVO EN CONDUCTOR SOTERRADO
04/07/2026 Ejecutada 18:36:16 18:49:34 1.28 CORRECTIVO EN CONDUCTOR SOTERRADO // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 17:45:27 18:34:17 1.28 CORRECTIVO EN CONDUCTOR SOTERRADO // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 17:41:03 17:45:19 1.28 CORRECTIVO EN CONDUCTOR SOTERRADO // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 17:37:20 17:40:56 1.28 CORRECTIVO EN CONDUCTOR SOTERRADO // DISPARO DESCONOCIDO
04/07/2026 Ejecutada 15:58:35 16:05:22 1.28 CORRECTIVO EN CONDUCTOR SOTERRADO // DISPARO DESCONOCIDO
03/07/2026 Ejecutada 13:06:45 15:13:23 2.11 SUSTITUCION TRANSFORMADOR MT
02/07/2026 Programada 09:00:00 14:00:00 5 DISPARO DESCONOCIDO // OTROS
02/07/2026 Ejecutada 17:33:54 17:39:15 2.14 DISPARO DESCONOCIDO // OTROS
02/07/2026 Ejecutada 15:07:58 15:12:01 2.14 DISPARO DESCONOCIDO // OTROS
02/07/2026 Ejecutada 09:04:11 10:57:15 2.14 DISPARO DESCONOCIDO // OTROS
02/07/2026 Ejecutada 00:25:44 00:31:33 2.14 DISPARO DESCONOCIDO // OTROS
01/07/2026 Ejecutada 16:41:50 16:46:14 0.17 FACILITAR TRABAJOS EMPRESA TRANSMISION // PREVENTIVO EN POSTE
01/07/2026 Ejecutada 12:11:14 12:16:53 0.17 FACILITAR TRABAJOS EMPRESA TRANSMISION // PREVENTIVO EN POSTE
El Cambiazo, Guzmancito, Palo Indio.