Circuito LPRA110A
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | C | C | C | C | C |
| Clientes | 1808 | 1808 | 1791 | 1791 | 1793 | 1799 | 1808 | 1800 | 1477 | 1481 | 1481 | 1501 |
| % Nivel Cobranza | 0.00% | 84.99% | 90.56% | 76.28% | 78.49% | 84.60% | 94.37% | 86.26% | 100.28% | 102.90% | 109.79% | 97.75% |
| % Nivel Pérdida | 0.00% | 71.76% | 69.89% | 67.33% | 63.36% | 68.47% | 67.33% | 61.09% | 69.07% | 70.46% | 70.93% | 69.72% |
| Energía Suministrada (GWh) | 0 | 1.35 | 1.24 | 1.20 | 0.98 | 0.96 | 0.92 | 0.80 | 0.91 | 0.97 | 1.02 | 1.14 |
| Energía Facturada (GWh) | 0 | 0.38 | 0.37 | 0.39 | 0.36 | 0.30 | 0.30 | 0.31 | 0.28 | 0.29 | 0.30 | 0.35 |
| Energía Cobrada (GWh) | 0 | 0.32 | 0.34 | 0.3 | 0.28 | 0.26 | 0.28 | 0.27 | 0.28 | 0.30 | 0.32 | 0.34 |
| % Servicio | 99.71% | 99.89% | 99.77% | 99.99% | 99.95% | 99.95% | 99.81% | 99.69% | 99.99% | 100.00% | 99.99% | 99.71% |
| % Sin Servicio | 0.29% | 0.11% | 0.23% | 0.01% | 0.05% | 0.05% | 0.19% | 0.31% | 0.01% | 0.00% | 0.01% | 0.29% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 2.08 | 0.80 | 1.64 | 0.07 | 0.36 | 0.36 | 1.35 | 2.27 | 0.09 | 0.00 | 0.10 | 2.08 |
| Promedio Interrupción Diarias (Hrs) | 0.07 | 0.03 | 0.05 | 0.00 | 0.01 | 0.01 | 0.04 | 0.07 | 0.00 | 0.00 | 0.00 | 0.07 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 17/10/2026 | Ejecutada | 07:24:03 | 07:29:47 | 0.10 | FALLA TRANSITORIA // |
| 13/10/2026 | Ejecutada | 14:19:25 | 14:49:54 | 0.51 | CORRECTIVO EN CONDUCTOR SECUNDARIO // |