Circuito LPRA110
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | A | B | C | C | C | C |
| Clientes | 10135 | 10135 | 10171 | 10191 | 10123 | 10074 | 10058 | 9998 | 10055 |
| % Nivel Cobranza | 0.00% | 92.82% | 94.74% | 97.37% | 96.87% | 90.44% | 98.87% | 105.95% | 96.26% |
| % Nivel Pérdida | 0.00% | 61.99% | 60.27% | 58.59% | 60.65% | 55.73% | 61.24% | 55.16% | 38.97% |
| Energía Suministrada (GWh) | 0 | 6.34 | 5.82 | 5.37 | 5.39 | 4.69 | 4.96 | 3.88 | 3.27 |
| Energía Facturada (GWh) | 0 | 2.41 | 2.31 | 2.22 | 2.12 | 2.08 | 1.92 | 1.74 | 1.99 |
| Energía Cobrada (GWh) | 0 | 2.24 | 2.19 | 2.16 | 2.05 | 1.88 | 1.9 | 1.84 | 1.92 |
| % Servicio | 98.87% | 98.44% | 99.31% | 99.75% | 98.98% | 99.66% | 98.13% | 97.10% | 98.44% |
| % Sin Servicio | 1.13% | 1.56% | 0.69% | 0.25% | 1.02% | 0.34% | 1.87% | 2.90% | 1.56% |
| Interrupción Programada (Hrs) | 3.00 | 3.00 | 0.00 | 1.00 | 3.00 | 0.00 | 8.00 | 15.00 | 7.00 |
| Interrupción Ejecutada (Hrs) | 8.22 | 11.38 | 5.03 | 1.80 | 7.47 | 2.48 | 13.63 | 21.18 | 11.41 |
| Promedio Interrupción Diarias (Hrs) | 0.27 | 0.37 | 0.17 | 0.06 | 0.25 | 0.08 | 0.45 | 0.70 | 0.38 |
Bo. Enriquillo de Herrera, Bo. Juan Pablo Duarte de Herrera, Bo. Las Palmas de Herrera, Savica (parcial), La Rosa, Banreservas de la Av. Duarte Vieja,