Circuito LPRA110

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A B C C C
Clientes 10090 10104 10104 10130 10134 10135 10171 10191 10123 10074 10058 9998
% Nivel Cobranza 0.00% 0.00% 112.97% 97.90% 91.23% 92.82% 94.74% 97.37% 96.87% 90.44% 98.87% 105.95%
% Nivel Pérdida 0.00% 0.00% 55.60% 54.01% 56.98% 61.99% 60.27% 58.59% 60.65% 55.73% 61.24% 55.16%
Energía Suministrada (GWh) 0 0 4.88 5.62 6.07 6.34 5.82 5.37 5.39 4.69 4.96 3.88
Energía Facturada (GWh) 0 0 2.17 2.59 2.61 2.41 2.31 2.22 2.12 2.08 1.92 1.74
Energía Cobrada (GWh) 0 0 2.45 2.53 2.38 2.24 2.19 2.16 2.05 1.88 1.9 1.84
% Servicio 99.92% 99.22% 97.74% 99.50% 98.87% 98.44% 99.31% 99.75% 98.98% 99.66% 98.13% 97.10%
% Sin Servicio 0.08% 0.78% 2.26% 0.50% 1.13% 1.56% 0.69% 0.25% 1.02% 0.34% 1.87% 2.90%
Interrupción Programada (Hrs) 0.00 0.00 5.00 3.00 3.00 3.00 0.00 1.00 3.00 0.00 8.00 15.00
Interrupción Ejecutada (Hrs) 0.59 5.82 16.51 3.63 8.22 11.38 5.03 1.80 7.47 2.48 13.63 21.18
Promedio Interrupción Diarias (Hrs) 0.02 0.19 0.54 0.12 0.27 0.37 0.17 0.06 0.25 0.08 0.45 0.70
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bo. Enriquillo de Herrera, Bo. Juan Pablo Duarte de Herrera, Bo. Las Palmas de Herrera, Savica (parcial), La Rosa, Banreservas de la Av. Duarte Vieja,