Circuito LPRA109

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 6082 6082 6084 6029 6021 6210 6195 6195 6196 6193 6200 6184
% Nivel Cobranza 0.00% 88.76% 98.42% 109.90% 96.09% 99.04% 103.27% 99.35% 106.09% 94.04% 96.75% 103.79%
% Nivel Pérdida 0.00% 14.27% 11.81% 17.22% -0.27% 10.06% 7.17% 5.65% 8.64% 8.76% 15.69% 16.53%
Energía Suministrada (GWh) 0 7.12 6.28 6.20 5.42 6.03 6.54 6.72 7.44 7.79 8.01 7.6
Energía Facturada (GWh) 0 6.11 5.54 5.13 5.44 5.42 6.08 6.35 6.80 7.11 6.76 6.34
Energía Cobrada (GWh) 0 5.42 5.45 5.64 5.22 5.37 6.27 6.30 7.21 6.68 6.54 6.58
% Servicio 99.52% 99.30% 99.30% 99.84% 97.78% 100.00% 99.84% 98.96% 99.47% 99.82% 99.56% 99.93%
% Sin Servicio 0.48% 0.70% 0.70% 0.16% 2.22% 0.00% 0.16% 1.04% 0.53% 0.18% 0.44% 0.07%
Interrupción Programada (Hrs) 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.48 5.04 5.04 1.14 15.96 0.00 1.22 7.58 3.88 1.32 3.22 0.52
Promedio Interrupción Diarias (Hrs) 0.11 0.17 0.17 0.04 0.52 0.00 0.04 0.25 0.13 0.04 0.11 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LPRA109
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.26
% Ejecución Operativa 0%
Detalle de Salidas - Circuito LPRA109
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 20:50:37 20:55:10 0.13 OBJETO LANZADO SOBRE LINEA // FALLA TRANSITORIA //
07/07/2026 Ejecutada 20:39:13 20:42:23 0.13 OBJETO LANZADO SOBRE LINEA // FALLA TRANSITORIA //
Evaristo Morales, Quisqueya (Parcial), Piantini (Parcial), Torre Acrópolis.