Buscar Circuitos Glosario

Circuito LPRA102

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación B B B B B B B B B B B B
Clientes 7917 7882 6494 6494 6497 6507 6477 6468 7449 7440 7440 7446
% Nivel Cobranza 93.91% 105.59% 86.40% 81.65% 89.94% 91.15% 111.64% 70.76% 123.22% 98.93% 99.61% 112.02%
% Nivel Pérdida 13.99% 24.45% 18.98% 20.73% 21.77% 18.21% 16.45% 4.67% 15.98% 7.61% 8.24% 12.53%
Energía Suministrada (GWh) 6.41 6.62 6.64 6.89 6.46 5.48 5.29 4.66 5.06 5.28 5.51 6.26
Energía Facturada (GWh) 5.52 5.00 5.38 5.46 5.05 4.48 4.42 4.44 4.25 4.88 5.06 5.48
Energía Cobrada (GWh) 5.18 5.28 4.65 4.46 4.55 4.08 4.94 3.14 5.24 4.83 5.04 6.13
% Servicio 99.14% 98.89% 99.25% 99.93% 99.96% 99.96% 99.32% 98.80% 99.52% 99.81% 98.59% 99.86%
% Sin Servicio 0.86% 1.11% 0.75% 0.07% 0.04% 0.04% 0.68% 1.20% 0.48% 0.19% 1.41% 0.14%
Interrupción Programada (Hrs) 0.00 1.00 4.00 0.00 0.00 0.00 3.00 3.00 3.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 6.19 8.03 5.38 0.53 0.26 0.26 4.91 8.66 3.46 1.44 10.31 1.00
Promedio Interrupción Diarias (Hrs) 0.20 0.26 0.18 0.02 0.01 0.01 0.16 0.28 0.11 0.05 0.34 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LPRA102
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.12
% Ejecución Operativa 0%
Detalle de Salidas - Circuito LPRA102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/10/2026 Ejecutada 05:14:18 05:18:14 0.07 FALLA TRANSITORIA //
16/10/2026 Ejecutada 16:22:04 16:25:04 0.05 FALLA TRANSITORIA //
Los Prados (parcial), Los Praditos (parcial),Urb. Carmelitas, Km. 9 Aut. Duarte, Los Ríos (parcial), Urb. Galá, Agua Planeta Azul, Yagüita, Villa Marina (parcial), Res. Luperón, Price Smart.