Buscar Circuitos Glosario

Circuito LPRA102

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 6497 6497 6507 6477 6468 7449 7440 7440 7446 7526 7526 7507
% Nivel Cobranza 0.00% 89.94% 91.15% 111.64% 70.76% 123.22% 98.93% 99.61% 112.02% 89.08% 126.97% 99.65%
% Nivel Pérdida 0.00% 21.77% 18.21% 16.45% 4.67% 15.98% 7.61% 8.24% 12.53% 11.79% 17.37% 21.84%
Energía Suministrada (GWh) 0 6.46 5.48 5.29 4.66 5.06 5.28 5.51 6.26 6.44 6.65 6.23
Energía Facturada (GWh) 0 5.05 4.48 4.42 4.44 4.25 4.88 5.06 5.48 5.69 5.5 4.87
Energía Cobrada (GWh) 0 4.55 4.08 4.94 3.14 5.24 4.83 5.04 6.13 5.06 6.98 4.85
% Servicio 99.93% 99.96% 99.96% 99.32% 98.80% 99.52% 99.81% 98.59% 99.86% 99.40% 99.90% 99.86%
% Sin Servicio 0.07% 0.04% 0.04% 0.68% 1.20% 0.48% 0.19% 1.41% 0.14% 0.60% 0.10% 0.14%
Interrupción Programada (Hrs) 0.00 0.00 0.00 3.00 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.53 0.26 0.26 4.91 8.66 3.46 1.44 10.31 1.00 4.39 0.71 1.04
Promedio Interrupción Diarias (Hrs) 0.02 0.01 0.01 0.16 0.28 0.11 0.05 0.34 0.03 0.14 0.02 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LPRA102
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 7.32
% Ejecución Operativa 183.00%
Detalle de Salidas - Circuito LPRA102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
04/07/2026 Programada 08:00:00 12:00:00 4.00 TRASVASE DE CARGA // TRASVASE DE CARGA //
04/07/2026 Ejecutada 14:13:56 14:31:29 3.66 TRASVASE DE CARGA // TRASVASE DE CARGA //
04/07/2026 Ejecutada 08:49:41 12:11:44 3.66 TRASVASE DE CARGA // TRASVASE DE CARGA //
Los Prados (parcial), Los Praditos (parcial),Urb. Carmelitas, Km. 9 Aut. Duarte, Los Ríos (parcial), Urb. Galá, Agua Planeta Azul, Yagüita, Villa Marina (parcial), Res. Luperón, Price Smart.