Circuito LMAT102

Distribuidora EdeSur - Provincia San Juan


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación B B B B B A B B B B A A
Clientes 9566 9566 9545 9460 9458 9396 9333 9312 9309 9267 9266 9221
% Nivel Cobranza 0.00% 101.32% 96.40% 90.19% 100.43% 83.04% 99.62% 89.02% 100.70% 94.95% 101.44% 98.68%
% Nivel Pérdida 0.00% 20.37% 15.40% 25.36% 26.53% 22.95% 28.76% 21.52% 33.39% 25.76% 19.64% 30.49%
Energía Suministrada (GWh) 0 2.24 2.29 2.55 2.47 2.4 2.32 2.15 2.25 1.96 2.02 2.2
Energía Facturada (GWh) 0 1.78 1.94 1.91 1.81 1.85 1.66 1.69 1.5 1.46 1.62 1.53
Energía Cobrada (GWh) 0 1.80 1.87 1.72 1.82 1.53 1.65 1.5 1.51 1.38 1.65 1.51
% Servicio 97.59% 97.92% 95.87% 96.95% 97.75% 98.38% 98.87% 98.72% 98.48% 96.37% 92.44% 98.77%
% Sin Servicio 2.41% 2.08% 4.13% 3.05% 2.25% 1.62% 1.13% 1.28% 1.52% 3.63% 7.56% 1.23%
Interrupción Programada (Hrs) 4.00 0.00 4.00 0.00 4.00 4.00 1.00 5.00 4.00 18.00 39.00 4.00
Interrupción Ejecutada (Hrs) 17.58 15.21 30.16 22.25 16.41 11.81 8.24 9.32 11.11 26.49 55.21 9.00
Promedio Interrupción Diarias (Hrs) 0.58 0.50 0.99 0.73 0.54 0.39 0.27 0.31 0.37 0.87 1.82 0.30
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro del pueblo de Las Matas de Farfán, Bo. Villa Esperanza, Bo. Pueblo Nuevo, Bo. La Milagrosa, Bo. La Antena, Bo. El Cristo, Bo. Villa Carmen , Escondido, Yabonico, Carrera de Yegua, Los Corocitos, La China, Cañada Segura, Guayabal, El Mamoncito, Arroyo Salado, Espinosa, Luis Simón, La Laguna, Los Alejos, Potroso, La Piedra, Pozo Hondo, Los Candelones, Los Limones, El Naranjo, El Batey, Los Cerritos, Angola, Los Aposentos, Pajonal, Los Amargos, Severino Barrero, La Gallera, Los Cartones, Barrio La Cruz, Las Minas, Los Gringos, Cañada Grande, Barrio Blanco, Los Copeyes, Pan de Azucar.