Circuito LMAT101

Distribuidora EdeSur - Provincia San Juan


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación B B B A B B B B A A A A
Clientes 8595 8595 8590 8601 8573 8541 8550 8537 8552 8552 8567 8555
% Nivel Cobranza 0.00% 80.45% 85.45% 75.00% 88.66% 74.77% 80.35% 77.76% 90.65% 91.95% 81.18% 88.91%
% Nivel Pérdida 0.00% 28.21% 30.44% 27.88% 31.52% 27.09% 32.74% 24.22% 22.11% 32.12% 20.29% 27.67%
Energía Suministrada (GWh) 0 1.72 1.72 1.64 1.64 1.56 1.58 1.36 1.45 1.56 1.45 1.6
Energía Facturada (GWh) 0 1.23 1.2 1.18 1.12 1.14 1.06 1.03 1.13 1.06 1.15 1.16
Energía Cobrada (GWh) 0 0.99 1.02 0.89 1 0.85 0.85 0.8 1.02 0.97 0.94 1.03
% Servicio 96.56% 96.63% 97.91% 98.04% 99.17% 99.60% 98.74% 96.44% 92.09% 98.66% 99.80% 97.66%
% Sin Servicio 3.44% 3.37% 2.09% 1.96% 0.83% 0.40% 1.26% 3.56% 7.91% 1.34% 0.20% 2.34%
Interrupción Programada (Hrs) 4.00 3.00 7.00 4.00 1.00 4.00 4.00 18.00 41.00 4.00 0.00 12.00
Interrupción Ejecutada (Hrs) 25.14 24.60 15.24 14.32 6.07 2.90 9.23 25.96 57.73 9.76 1.47 17.08
Promedio Interrupción Diarias (Hrs) 0.83 0.81 0.50 0.47 0.20 0.10 0.30 0.85 1.90 0.32 0.05 0.56
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El Cercado, La Estancia, El Mamón, La Rancha, Majagual, La Colonia, El Vallecito, Bartolo, Loma En medio, Pinal Grande, Sonador, Juan Santiago, Sabana de Chen, Los Guineos, La Zahonada, El Vallecito, La Fuente, Hondo Valle, Los Rincones, La Palmita, Abre la Yaya, El Pino, Sabana Genjibre , La Navaja, Guayabal.