Circuito LM3808
Distribuidora EdeEste - Provincia Santo Domingo
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 11771 | 11771 | 11788 | 11797 | 11828 | 11828 | 11795 | 11792 | 11800 | 11845 | 11888 | 11908 |
| % Nivel Cobranza | 0.00% | 98.05% | 84.83% | 89.87% | 110.60% | 97.23% | 109.36% | 108.10% | 112.70% | 105.55% | 93.43% | 87.32% |
| % Nivel Pérdida | 0.00% | 36.62% | 32.37% | 30.17% | 33.62% | 21.59% | 28.54% | 29.11% | 27.78% | 27.53% | 28.99% | 34.49% |
| Energía Suministrada (GWh) | 0 | 8.07 | 7.46 | 6.06 | 6.02 | 5.39 | 5.98 | 6.37 | 6.58 | 7.46 | 8.12 | 8.3 |
| Energía Facturada (GWh) | 0 | 5.12 | 5.04 | 4.23 | 4.00 | 4.23 | 4.28 | 4.51 | 4.76 | 5.41 | 5.77 | 5.44 |
| Energía Cobrada (GWh) | 0 | 5.02 | 4.28 | 3.8 | 4.42 | 4.11 | 4.68 | 4.88 | 5.36 | 5.71 | 5.39 | 4.75 |
| % Servicio | 99.77% | 99.29% | 96.08% | 99.20% | 98.76% | 96.89% | 99.57% | 99.00% | 97.49% | 98.81% | 98.85% | 99.08% |
| % Sin Servicio | 0.23% | 0.71% | 3.92% | 0.80% | 1.24% | 3.11% | 0.43% | 1.00% | 2.51% | 1.19% | 1.15% | 0.92% |
| Interrupción Programada (Hrs) | 12.00 | 28.00 | 15.00 | 24.00 | 17.00 | 4.00 | 5.00 | 0.00 | 12.00 | 12.00 | 4.00 | 12.00 |
| Interrupción Ejecutada (Hrs) | 1.67 | 5.08 | 28.23 | 5.77 | 8.93 | 22.42 | 3.10 | 7.47 | 18.35 | 8.70 | 8.40 | 6.73 |
| Promedio Interrupción Diarias (Hrs) | 0.05 | 0.17 | 0.93 | 0.19 | 0.29 | 0.74 | 0.10 | 0.25 | 0.60 | 0.29 | 0.28 | 0.22 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 10/08/2026 | Ejecutada | 14:18:00 | 14:27:00 | 0.15 | DISTRIBUCION (PROYECTOS) - INSTALAR TRANSFORMADOR |
| 07/08/2026 | Ejecutada | 10:32:00 | 12:27:00 | 1.92 | TRANSMISION - SALIDA DE LINEA 138 KV |
| 06/08/2026 | Ejecutada | 16:46:00 | 16:54:00 | 0.83 | DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 06/08/2026 | Ejecutada | 13:05:00 | 13:47:00 | 0.83 | DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |