Circuito LDAM101
Distribuidora EdeSur - Provincia Independencia
| Mes-Año | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | D | D | D | A | B | D | D | D | A | A | A | A |
| Clientes | 5833 | 5833 | 3670 | 3664 | 3642 | 3646 | 3642 | 3633 | 3625 | 3615 | 3634 | 3651 |
| % Nivel Cobranza | 0.00% | 97.99% | 88.55% | 158.21% | 99.25% | 100.86% | 98.59% | 78.86% | 108.14% | 105.61% | 94.07% | 116.08% |
| % Nivel Pérdida | 0.00% | 50.53% | 71.23% | 74.01% | 67.96% | 62.93% | 70.49% | 68.71% | 66.61% | 73.56% | 58.86% | 43.01% |
| Energía Suministrada (GWh) | 0 | 3.68 | 3.85 | 3.64 | 3.14 | 3.06 | 3.56 | 3.03 | 3.07 | 3.2 | 2.23 | 1.97 |
| Energía Facturada (GWh) | 0 | 1.82 | 1.11 | 0.95 | 1.01 | 1.14 | 1.05 | 0.95 | 1.03 | 0.84 | 0.92 | 1.12 |
| Energía Cobrada (GWh) | 0 | 1.78 | 0.98 | 1.5 | 1 | 1.15 | 1.03 | 0.75 | 1.11 | 0.89 | 0.86 | 1.3 |
| % Servicio | 97.27% | 98.45% | 97.04% | 94.89% | 94.63% | 98.26% | 98.75% | 97.24% | 90.73% | 100.00% | 99.04% | 94.97% |
| % Sin Servicio | 2.73% | 1.55% | 2.96% | 5.11% | 5.37% | 1.74% | 1.25% | 2.76% | 9.27% | 0.00% | 0.96% | 5.03% |
| Interrupción Programada (Hrs) | 13.00 | 10.00 | 20.00 | 16.00 | 9.00 | 0.00 | 6.00 | 18.00 | 45.00 | 3.00 | 3.00 | 10.00 |
| Interrupción Ejecutada (Hrs) | 19.90 | 11.32 | 21.60 | 37.29 | 39.19 | 12.73 | 9.12 | 20.15 | 67.70 | 0.00 | 6.98 | 36.73 |
| Promedio Interrupción Diarias (Hrs) | 0.65 | 0.37 | 0.71 | 1.23 | 1.29 | 0.42 | 0.30 | 0.66 | 2.23 | 0.00 | 0.23 | 1.21 |
Puerto Escondido, Pueblo de Duvergé, Hospital Dr. José Pérez de Duvergé, Los proyectos Agrícolas de Espartillo Duvergé, Vengan a Ver, Mal Paso, La Baitoa, Mella, Barrio Japón, Pueblo de la Colonia de Duvergé, Angostura, proyecto Agrícola de Angostura