Circuito LDAM101

Distribuidora EdeSur - Provincia Independencia


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación D D D D D D D D D A B D
Clientes 3680 3680 3672 3657 3657 3661 3658 5833 3670 3664 3642 3646
% Nivel Cobranza 0.00% 76.27% 90.96% 105.96% 154.88% 132.51% 141.07% 97.99% 88.55% 158.21% 99.25% 100.86%
% Nivel Pérdida 0.00% 32.83% 38.42% 45.50% 41.20% 27.54% 43.96% 50.53% 71.23% 74.01% 67.96% 62.93%
Energía Suministrada (GWh) 0 1.46 1.60 1.61 1.46 1.54 1.99 3.68 3.85 3.64 3.14 3.06
Energía Facturada (GWh) 0 0.98 0.98 0.88 0.86 1.12 1.11 1.82 1.11 0.95 1.01 1.14
Energía Cobrada (GWh) 0 0.75 0.89 0.93 1.32 1.48 1.57 1.78 0.98 1.5 1 1.15
% Servicio 95.59% 95.40% 97.92% 97.50% 96.61% 93.58% 97.27% 98.45% 97.04% 94.89% 94.63% 98.26%
% Sin Servicio 4.41% 4.60% 2.08% 2.50% 3.39% 6.42% 2.73% 1.55% 2.96% 5.11% 5.37% 1.74%
Interrupción Programada (Hrs) 33.00 24.00 16.00 16.00 19.00 27.00 13.00 10.00 20.00 16.00 9.00 0.00
Interrupción Ejecutada (Hrs) 31.73 33.13 14.97 18.62 24.71 46.88 19.90 11.32 21.60 37.29 39.19 12.73
Promedio Interrupción Diarias (Hrs) 1.04 1.09 0.49 0.61 0.81 1.54 0.65 0.37 0.71 1.23 1.29 0.42
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Puerto Escondido, Pueblo de Duvergé, Hospital Dr. José Pérez de Duvergé, Los proyectos Agrícolas de Espartillo Duvergé, Vengan a Ver, Mella, Barrio Japón, Pueblo de la Colonia de Duvergé, Angostura, proyecto Agrícola de Angostura