Circuito LDAM101
Distribuidora EdeSur - Provincia Independencia
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | D | D | D | A | A | A | A | A | A | A | A | A |
Clientes | 3642 | 3642 | 3633 | 3625 | 3615 | 3634 | 3651 | 3637 | 3621 | 3620 | 3612 | 3623 |
% Nivel Cobranza | 0.00% | 98.59% | 78.86% | 108.14% | 105.61% | 94.07% | 116.08% | 109.87% | 81.88% | 100.97% | 107.90% | 78.20% |
% Nivel Pérdida | 0.00% | 70.49% | 68.71% | 66.61% | 73.56% | 58.86% | 43.01% | 52.67% | 49.89% | 52.15% | 54.04% | 48.84% |
Energía Suministrada (GWh) | 0 | 3.56 | 3.03 | 3.07 | 3.2 | 2.23 | 1.97 | 2.18 | 2.19 | 2 | 2.12 | 2.14 |
Energía Facturada (GWh) | 0 | 1.05 | 0.95 | 1.03 | 0.84 | 0.92 | 1.12 | 1.03 | 1.1 | 0.96 | 0.97 | 1.1 |
Energía Cobrada (GWh) | 0 | 1.03 | 0.75 | 1.11 | 0.89 | 0.86 | 1.3 | 1.13 | 0.9 | 0.97 | 1.05 | 0.86 |
% Servicio | 98.26% | 98.75% | 97.24% | 90.73% | 100.00% | 99.04% | 94.97% | 96.94% | 95.79% | 97.95% | 98.26% | 97.99% |
% Sin Servicio | 1.74% | 1.25% | 2.76% | 9.27% | 0.00% | 0.96% | 5.03% | 3.06% | 4.21% | 2.05% | 1.74% | 2.01% |
Interrupción Programada (Hrs) | 0.00 | 6.00 | 18.00 | 45.00 | 3.00 | 3.00 | 10.00 | 7.00 | 0.00 | 3.00 | 7.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 12.73 | 9.12 | 20.15 | 67.70 | 0.00 | 6.98 | 36.73 | 22.30 | 30.77 | 14.95 | 12.69 | 14.64 |
Promedio Interrupción Diarias (Hrs) | 0.42 | 0.30 | 0.66 | 2.23 | 0.00 | 0.23 | 1.21 | 0.73 | 1.01 | 0.49 | 0.42 | 0.48 |
Puerto Escondido, Pueblo de Duvergé, Hospital Dr. José Pérez de Duvergé, Los proyectos Agrícolas de Espartillo Duvergé, Vengan a Ver, Pueblo de Jimaní, Mal Paso, La Baitoa, El Limón de Jimani, Proyecto agrícola del Limón de Jimani, Mella, Barrio Japón, Pueblo de la Colonia de Duvergé, Angostura, proyecto Agrícola de Angostura