Circuito LDAM101

Distribuidora EdeSur - Provincia Independencia


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación D D D A B D D D A A A A
Clientes 5833 5833 3670 3664 3642 3646 3642 3633 3625 3615 3634 3651
% Nivel Cobranza 0.00% 97.99% 88.55% 158.21% 99.25% 100.86% 98.59% 78.86% 108.14% 105.61% 94.07% 116.08%
% Nivel Pérdida 0.00% 50.53% 71.23% 74.01% 67.96% 62.93% 70.49% 68.71% 66.61% 73.56% 58.86% 43.01%
Energía Suministrada (GWh) 0 3.68 3.85 3.64 3.14 3.06 3.56 3.03 3.07 3.2 2.23 1.97
Energía Facturada (GWh) 0 1.82 1.11 0.95 1.01 1.14 1.05 0.95 1.03 0.84 0.92 1.12
Energía Cobrada (GWh) 0 1.78 0.98 1.5 1 1.15 1.03 0.75 1.11 0.89 0.86 1.3
% Servicio 97.27% 98.45% 97.04% 94.89% 94.63% 98.26% 98.75% 97.24% 90.73% 100.00% 99.04% 94.97%
% Sin Servicio 2.73% 1.55% 2.96% 5.11% 5.37% 1.74% 1.25% 2.76% 9.27% 0.00% 0.96% 5.03%
Interrupción Programada (Hrs) 13.00 10.00 20.00 16.00 9.00 0.00 6.00 18.00 45.00 3.00 3.00 10.00
Interrupción Ejecutada (Hrs) 19.90 11.32 21.60 37.29 39.19 12.73 9.12 20.15 67.70 0.00 6.98 36.73
Promedio Interrupción Diarias (Hrs) 0.65 0.37 0.71 1.23 1.29 0.42 0.30 0.66 2.23 0.00 0.23 1.21
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Puerto Escondido, Pueblo de Duvergé, Hospital Dr. José Pérez de Duvergé, Los proyectos Agrícolas de Espartillo Duvergé, Vengan a Ver, Mal Paso, La Baitoa, Mella, Barrio Japón, Pueblo de la Colonia de Duvergé, Angostura, proyecto Agrícola de Angostura