Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 38 38 38 37 37 36 36 36 37 36 39 39
% Nivel Cobranza 0.00% 27.11% 112.38% 72.08% 75.93% 81.50% 27.93% 92.20% 266.86% 154.54% 122.21% 66.39%
% Nivel Pérdida 0.00% -8.12% 65.97% 62.51% 69.82% 77.89% 79.16% 92.42% 92.04% 80.57% 70.80% 62.31%
Energía Suministrada (GWh) 0 0.21 0.18 0.19 0.17 0.19 0.18 0.18 0.18 0.21 0.22 0.22
Energía Facturada (GWh) 0 0.22 0.06 0.07 0.05 0.04 0.04 0.01 0.01 0.04 0.06 0.08
Energía Cobrada (GWh) 0 0.06 0.07 0.05 0.04 0.04 0.01 0.01 0.04 0.06 0.08 0.05
% Servicio 98.75% 98.28% 98.28% 99.57% 97.28% 99.29% 98.73% 98.06% 96.19% 98.50% 96.27% 98.30%
% Sin Servicio 1.25% 1.72% 1.72% 0.43% 2.72% 0.71% 1.27% 1.94% 3.81% 1.50% 3.73% 1.70%
Interrupción Programada (Hrs) 7.00 14.00 14.00 0.00 3.00 6.00 5.00 5.00 8.00 6.00 7.00 3.00
Interrupción Ejecutada (Hrs) 8.97 12.41 12.41 3.13 19.56 5.09 9.47 14.19 27.82 10.96 27.23 12.40
Promedio Interrupción Diarias (Hrs) 0.29 0.41 0.41 0.10 0.64 0.17 0.31 0.47 0.91 0.36 0.90 0.41
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito LBAR102
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.16
% Ejecución Operativa 0%
Detalle de Salidas - Circuito LBAR102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
03/07/2026 Ejecutada 15:39:12 15:40:12 0.02 FALLA TRANSITORIA //
02/07/2026 Ejecutada 06:34:34 06:35:42 0.02 FALLA TRANSITORIA //
27/06/2026 Ejecutada 12:50:40 14:57:49 2.12 CORRECTIVO EN POSTE //
La Rapidita, Tres Bombas de Agua de INAPA, El Horno, Mana, La Peña.