Circuito LALF103
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Jun26 | May26 | Abr26 |
|---|---|---|---|
| Clasificación | A | A | A |
| Clientes | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 100.00% | 100.00% |
| Energía Suministrada (GWh) | 0 | 0.70 | 0.29 |
| Energía Facturada (GWh) | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 |
| % Servicio | 99.56% | 100.00% | 100.00% |
| % Sin Servicio | 0.44% | 0.00% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 3.20 | 0.00 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.11 | 0.00 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 29/06/2026 | Ejecutada | 17:47:11 | 20:59:21 | 3.20 | FALLA EN TENSION DC SS/EE // |