Circuito LALF103
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Sep26 | Ago26 | Jul26 | Jun26 | May26 | Abr26 |
|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A |
| Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 95.31% | 98.77% | 98.50% | 101.10% | 0.00% | 0.00% |
| % Nivel Pérdida | -10.15% | 4.00% | 1.90% | -2.36% | 100.00% | 100.00% |
| Energía Suministrada (GWh) | 0.70 | 0.76 | 0.74 | 0.70 | 0.70 | 0.29 |
| Energía Facturada (GWh) | 0.77 | 0.73 | 0.72 | 0.71 | 0 | 0 |
| Energía Cobrada (GWh) | 0.73 | 0.72 | 0.71 | 0.72 | 0 | 0 |
| % Servicio | 99.97% | 100.00% | 100.00% | 99.56% | 100.00% | 100.00% |
| % Sin Servicio | 0.03% | 0.00% | 0.00% | 0.44% | 0.00% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 0.21 | 0.00 | 0.00 | 3.20 | 0.00 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.01 | 0.00 | 0.00 | 0.11 | 0.00 | 0.00 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 04/09/2026 | Ejecutada | 11:11:04 | 11:23:33 | 0.21 | DISPARO LÍNEA 69 KV // |