Circuito LALF102
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 |
|---|---|---|---|---|
| Clasificación | A | A | A | A |
| Clientes | 7993 | 7993 | 7962 | 7946 |
| % Nivel Cobranza | 0.00% | 97.42% | 94.59% | 94.35% |
| % Nivel Pérdida | 0.00% | 36.62% | 26.22% | 2.50% |
| Energía Suministrada (GWh) | 0 | 4.96 | 4.12 | 2.86 |
| Energía Facturada (GWh) | 0 | 3.14 | 3.04 | 2.79 |
| Energía Cobrada (GWh) | 0 | 3.06 | 2.88 | 2.63 |
| % Servicio | 99.07% | 97.97% | 98.30% | 98.30% |
| % Sin Servicio | 0.93% | 2.03% | 1.70% | 1.70% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 6.73 | 14.60 | 12.23 | 12.23 |
| Promedio Interrupción Diarias (Hrs) | 0.22 | 0.48 | 0.40 | 0.40 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 15/08/2026 | Ejecutada | 08:22:00 | 08:34:52 | 0.21 | FALLA TRANSITORIA // |
| 13/08/2026 | Ejecutada | 17:58:31 | 18:02:42 | 0.40 | REPOSICIÓN DE JUMPER // FALLA TRANSITORIA // |
| 13/08/2026 | Ejecutada | 16:15:56 | 16:35:57 | 0.40 | REPOSICIÓN DE JUMPER // FALLA TRANSITORIA // |
| 09/08/2026 | Ejecutada | 22:49:32 | 23:00:32 | 0.31 | FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE |
| 09/08/2026 | Ejecutada | 10:51:16 | 10:52:21 | 0.31 | FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE |
| 09/08/2026 | Ejecutada | 07:42:00 | 07:48:34 | 0.31 | FALLA TRANSITORIA // FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE |