Circuito KREA101

Distribuidora EdeNorte - Provincia Santiago Rodriguez


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
% Nivel Pérdida 0.00% 3.74% 12.04% -10.18% 17.44% -23.05% 4.34% 0.47% -0.96% -3.56% -7.85% -1.83%
Energía Suministrada (GWh) 0 4.01 3.85 3.37 3.71 3.06 3.74 3.59 3.56 3.59 3.71 4
Energía Facturada (GWh) 0 3.86 3.39 3.72 3.06 3.77 3.57 3.57 3.6 3.72 4 4.07
Energía Cobrada (GWh) 0 3.86 3.39 3.72 3.06 3.77 3.57 3.57 3.6 3.72 4 4.07
% Servicio 99.02% 100.00% 99.11% 99.89% 99.32% 98.52% 99.85% 99.99% 98.04% 99.36% 99.91% 100.00%
% Sin Servicio 0.98% 0.00% 0.89% 0.11% 0.68% 1.48% 0.15% 0.01% 1.96% 0.64% 0.09% 0.00%
Interrupción Programada (Hrs) 9.00 0.00 6.00 6.00 5.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 7.07 0.00 6.44 0.82 4.88 10.63 1.10 0.06 14.34 4.69 0.67 0.00
Promedio Interrupción Diarias (Hrs) 0.23 0.00 0.21 0.03 0.16 0.35 0.04 0.00 0.47 0.15 0.02 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KREA101
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.05
% Ejecución Operativa 0%
Detalle de Salidas - Circuito KREA101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Ejecutada 11:00:58 11:04:12 0.05 DISPARO DESCONOCIDO 34.5 KV
Kola Real.