Buscar Circuitos Glosario

Circuito KQAZ101B

Distribuidora EdeSur - Provincia Azua


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación D D D D D D D D D D D D
Clientes 841 841 703 703 703 703 703 700 700 707 701 702
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 94.99% 72.37% 127.29% 87.46% 99.07% 127.09%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -9.44% 3.71% 4.56% -19.83% 10.11% -5.93%
Energía Suministrada (GWh) 0 0 0 0 0 0 0.32 0.36 0.27 0.29 0.36 0.32
Energía Facturada (GWh) 0 0 0 0 0 0 0.35 0.35 0.26 0.35 0.32 0.33
Energía Cobrada (GWh) 0 0 0 0 0 0 0.33 0.25 0.33 0.30 0.32 0.43
% Servicio 99.97% 98.54% 95.06% 95.06% 97.05% 97.16% 97.71% 98.34% 97.86% 95.89% 98.00% 96.75%
% Sin Servicio 0.03% 1.46% 4.94% 4.94% 2.95% 2.84% 2.29% 1.66% 2.14% 4.11% 2.00% 3.25%
Interrupción Programada (Hrs) 0.00 0.00 13.00 13.00 16.00 16.00 10.00 6.00 8.00 17.00 7.00 8.00
Interrupción Ejecutada (Hrs) 0.24 10.49 35.54 35.54 21.27 20.46 16.47 12.34 15.59 29.99 14.63 23.75
Promedio Interrupción Diarias (Hrs) 0.01 0.34 1.17 1.17 0.70 0.67 0.54 0.41 0.51 0.99 0.48 0.78
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KQAZ101B
Interrupciones Programadas 1.00
Interrupciones Ejecutadas 2.56
% Ejecución Operativa 256.00%
Detalle de Salidas - Circuito KQAZ101B
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/08/2026 Programada 13:00:00 14:00:00 1.00
11/08/2026 Ejecutada 23:48:47 23:52:37 0.11 INSTALAR CAPACITOR // FALLA TRANSITORIA //
11/08/2026 Ejecutada 19:13:03 19:15:37 0.11 INSTALAR CAPACITOR // FALLA TRANSITORIA //
09/08/2026 Ejecutada 16:39:24 18:59:34 2.34 RAMAS SOBRE LÍNEA //
Proyecto Ganadero, Pueblo Viejo, Barrera.