Circuito KDIE110A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B A A A A A A A A A
Clientes 7347 7347 7335 7324 7315 7326 7326 7287 7287 7287 6608 6608
% Nivel Cobranza 0.00% 98.01% 100.26% 104.10% 111.88% 112.00% 100.18% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 23.99% 9.89% 16.53% 19.49% 9.04% -5.87% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 3.6 2.88 3.19 3.41 3.35 3.38 0 0 0 0 0
Energía Facturada (GWh) 0 2.73 2.59 2.67 2.74 3.04 3.58 0 0 0 0 0
Energía Cobrada (GWh) 0 2.68 2.6 2.78 3.07 3.41 3.59 0 0 0 0 0
% Servicio 99.78% 99.76% 99.74% 99.87% 99.95% 99.63% 99.79% 99.62% 99.73% 99.67% 99.02% 99.81%
% Sin Servicio 0.22% 0.24% 0.26% 0.13% 0.05% 0.37% 0.21% 0.38% 0.27% 0.33% 0.98% 0.19%
Interrupción Programada (Hrs) 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.58 1.74 1.92 0.92 0.38 2.70 1.50 2.77 1.95 2.41 7.19 1.35
Promedio Interrupción Diarias (Hrs) 0.05 0.06 0.06 0.03 0.01 0.09 0.05 0.09 0.06 0.08 0.24 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Ciudad Real I, Ciudad Real II, Villa Claudia, Residencial Graciela, Carmen María