Circuito KDIE107

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B A A A A A A A A A
Clientes 5766 5763 5759 5757 4692 4711 4715 4699 4706 4456 4438 4450
% Nivel Cobranza 86.48% 97.42% 93.21% 121.71% 84.42% 105.09% 105.36% 83.79% 95.12% 101.03% 92.00% 119.25%
% Nivel Pérdida 11.46% 28.91% 18.48% 34.19% 21.85% -5.32% 29.39% 30.65% 32.30% 31.82% 29.31% 39.34%
Energía Suministrada (GWh) 3.13 3.34 2.83 3.83 3.98 3.98 5.15 4.94 5.13 4.98 4.81 4.84
Energía Facturada (GWh) 2.77 2.38 2.31 2.52 3.11 4.19 3.63 3.43 3.47 3.39 3.4 2.94
Energía Cobrada (GWh) 2.4 2.31 2.15 3.07 2.62 4.4 3.83 2.87 3.3 3.43 3.13 3.5
% Servicio 99.03% 99.19% 98.58% 98.98% 99.94% 99.32% 96.76% 97.52% 97.95% 98.71% 99.10% 99.77%
% Sin Servicio 0.97% 0.81% 1.42% 1.02% 0.06% 0.68% 3.24% 2.48% 2.05% 1.29% 0.90% 0.23%
Interrupción Programada (Hrs) 6.00 0.00 1.00 7.00 0.00 3.00 15.00 10.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 7.09 5.91 10.34 7.45 0.47 4.96 23.67 18.11 14.96 9.43 6.56 1.68
Promedio Interrupción Diarias (Hrs) 0.23 0.19 0.34 0.25 0.02 0.16 0.78 0.60 0.49 0.31 0.22 0.06
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Av. Los Beisbolistas (parcial), Bo. Holguin de Herrera, Santa Martha, San Benito, Los Ríos (parcial), Villa Marina, Villa Aura (parcial)