Circuito KDIE105G

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 3552 3552 3580 3546 3551 3529 3542 3552 3556 3545 3561 3598
% Nivel Cobranza 0.00% 85.88% 101.27% 92.92% 96.77% 87.11% 106.64% 93.75% 99.62% 99.78% 98.02% 98.50%
% Nivel Pérdida 0.00% 63.96% 64.32% 60.87% 63.04% 57.49% 65.70% 53.69% 55.22% 59.78% 54.57% 45.44%
Energía Suministrada (GWh) 0 2.2 2.03 1.84 1.88 1.66 1.74 1.35 1.5 1.63 1.54 1.41
Energía Facturada (GWh) 0 0.79 0.72 0.72 0.7 0.7 0.6 0.63 0.67 0.66 0.7 0.77
Energía Cobrada (GWh) 0 0.68 0.73 0.67 0.67 0.61 0.64 0.59 0.67 0.65 0.68 0.76
% Servicio 99.82% 99.49% 98.90% 99.89% 99.78% 99.96% 99.74% 99.83% 99.99% 99.92% 99.97% 98.01%
% Sin Servicio 0.18% 0.51% 1.10% 0.11% 0.22% 0.04% 0.26% 0.17% 0.01% 0.08% 0.03% 1.99%
Interrupción Programada (Hrs) 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.34 3.70 8.02 0.82 1.62 0.31 1.92 1.25 0.06 0.59 0.20 14.54
Promedio Interrupción Diarias (Hrs) 0.04 0.12 0.26 0.03 0.05 0.01 0.06 0.04 0.00 0.02 0.01 0.48
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Savica, Las Mercedes (parcial)