Circuito KDIE105G

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación C C C C C C C C C A B C
Clientes 3562 3562 3523 3527 3527 3535 3572 3552 3580 3546 3551 3529
% Nivel Cobranza 0.00% 95.56% 106.23% 99.12% 101.73% 97.82% 91.20% 85.88% 101.27% 92.92% 96.77% 87.11%
% Nivel Pérdida 0.00% 55.27% 58.46% 58.96% 60.76% 59.41% 61.14% 63.96% 64.32% 60.87% 63.04% 57.49%
Energía Suministrada (GWh) 0 1.41 1.56 1.65 1.72 1.92 2.05 2.2 2.03 1.84 1.88 1.66
Energía Facturada (GWh) 0 0.63 0.65 0.68 0.68 0.78 0.8 0.79 0.72 0.72 0.7 0.7
Energía Cobrada (GWh) 0 0.60 0.69 0.67 0.69 0.76 0.73 0.68 0.73 0.67 0.67 0.61
% Servicio 99.99% 99.56% 100.00% 99.45% 99.40% 99.62% 99.82% 99.49% 98.90% 99.89% 99.78% 99.96%
% Sin Servicio 0.01% 0.44% 0.00% 0.55% 0.60% 0.38% 0.18% 0.51% 1.10% 0.11% 0.22% 0.04%
Interrupción Programada (Hrs) 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.10 3.17 0.00 4.12 4.34 2.77 1.34 3.70 8.02 0.82 1.62 0.31
Promedio Interrupción Diarias (Hrs) 0.00 0.10 0.00 0.14 0.14 0.09 0.04 0.12 0.26 0.03 0.05 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Savica, Las Mercedes (parcial)