Circuito KDIE104C

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 6241 6241 6142 6042 6012 5985 5971 5942 5938 5926 5958 5984
% Nivel Cobranza 0.00% 90.29% 100.35% 88.37% 99.15% 100.82% 85.85% 96.47% 104.86% 93.13% 106.80% 95.34%
% Nivel Pérdida 0.00% 60.40% 63.05% 59.90% 58.50% 54.74% 58.41% 56.59% 58.26% 58.45% 58.46% 47.78%
Energía Suministrada (GWh) 0 4.86 4.88 4.43 3.79 3.31 4.21 3.26 3.54 3.91 3.69 3.45
Energía Facturada (GWh) 0 1.92 1.8 1.78 1.57 1.5 1.75 1.42 1.48 1.62 1.53 1.8
Energía Cobrada (GWh) 0 1.74 1.81 1.57 1.56 1.51 1.5 1.37 1.55 1.51 1.64 1.72
% Servicio 93.55% 92.43% 96.53% 95.19% 99.93% 98.45% 97.77% 95.34% 92.15% 98.62% 95.57% 95.63%
% Sin Servicio 6.45% 7.57% 3.47% 4.81% 0.07% 1.55% 2.23% 4.66% 7.85% 1.38% 4.43% 4.37%
Interrupción Programada (Hrs) 6.00 7.00 16.00 12.00 7.00 0.00 0.00 0.00 1.00 3.00 8.00 0.00
Interrupción Ejecutada (Hrs) 47.07 55.23 25.31 35.14 0.53 11.32 16.30 34.04 57.28 10.09 32.33 31.93
Promedio Interrupción Diarias (Hrs) 1.55 1.82 0.83 1.16 0.02 0.37 0.54 1.12 1.88 0.33 1.06 1.05
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Km. 14 Aut. Duarte, La Ciénaga, Los Hidalgos, La Concordia.