Circuito KDIE104C

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C A B C C C A A A A A A
Clientes 6042 6042 6012 5985 5971 5942 5938 5926 5958 5984 5972 5992
% Nivel Cobranza 0.00% 88.37% 99.15% 100.82% 85.85% 96.47% 104.86% 93.13% 106.80% 95.34% 96.26% 84.43%
% Nivel Pérdida 0.00% 59.90% 58.50% 54.74% 58.41% 56.59% 58.26% 58.45% 58.46% 47.78% 51.17% 48.53%
Energía Suministrada (GWh) 0 4.43 3.79 3.31 4.21 3.26 3.54 3.91 3.69 3.45 3.54 3.73
Energía Facturada (GWh) 0 1.78 1.57 1.5 1.75 1.42 1.48 1.62 1.53 1.8 1.73 1.92
Energía Cobrada (GWh) 0 1.57 1.56 1.51 1.5 1.37 1.55 1.51 1.64 1.72 1.66 1.62
% Servicio 96.53% 95.19% 99.93% 98.45% 97.77% 95.34% 92.15% 98.62% 95.57% 95.63% 98.90% 96.42%
% Sin Servicio 3.47% 4.81% 0.07% 1.55% 2.23% 4.66% 7.85% 1.38% 4.43% 4.37% 1.10% 3.58%
Interrupción Programada (Hrs) 16.00 12.00 7.00 0.00 0.00 0.00 1.00 3.00 8.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 25.31 35.14 0.53 11.32 16.30 34.04 57.28 10.09 32.33 31.93 8.05 26.11
Promedio Interrupción Diarias (Hrs) 0.83 1.16 0.02 0.37 0.54 1.12 1.88 0.33 1.06 1.05 0.26 0.86
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Km. 14 Aut. Duarte, La Ciénaga, Los Hidalgos, La Concordia.