Circuito KDIE104C

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A B C C C
Clientes 6457 6416 6416 6365 6311 6241 6142 6042 6012 5985 5971 5942
% Nivel Cobranza 0.00% 0.00% 102.94% 96.14% 93.24% 90.29% 100.35% 88.37% 99.15% 100.82% 85.85% 96.47%
% Nivel Pérdida 0.00% 0.00% 51.73% 57.50% 53.75% 60.40% 63.05% 59.90% 58.50% 54.74% 58.41% 56.59%
Energía Suministrada (GWh) 0 0 3.68 4.76 4.19 4.86 4.88 4.43 3.79 3.31 4.21 3.26
Energía Facturada (GWh) 0 0 1.77 2.02 1.94 1.92 1.8 1.78 1.57 1.5 1.75 1.42
Energía Cobrada (GWh) 0 0 1.83 1.95 1.81 1.74 1.81 1.57 1.56 1.51 1.5 1.37
% Servicio 96.58% 97.43% 97.14% 96.64% 93.55% 92.43% 96.53% 95.19% 99.93% 98.45% 97.77% 95.34%
% Sin Servicio 3.42% 2.57% 2.86% 3.36% 6.45% 7.57% 3.47% 4.81% 0.07% 1.55% 2.23% 4.66%
Interrupción Programada (Hrs) 10.00 12.00 11.00 15.00 6.00 7.00 16.00 12.00 7.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 24.66 19.12 20.91 24.54 47.07 55.23 25.31 35.14 0.53 11.32 16.30 34.04
Promedio Interrupción Diarias (Hrs) 0.81 0.63 0.69 0.81 1.55 1.82 0.83 1.16 0.02 0.37 0.54 1.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Km. 14 Aut. Duarte, La Ciénaga, Los Hidalgos, La Concordia.