Circuito KDIE104
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | A | B | C | C | C | A | A |
| Clientes | 3824 | 3824 | 3810 | 3804 | 3808 | 3807 | 3810 | 3815 | 3808 | 3801 | 3797 | 3795 |
| % Nivel Cobranza | 0.00% | 95.37% | 102.44% | 90.27% | 94.48% | 119.65% | 80.45% | 100.78% | 133.23% | 94.48% | 86.15% | 120.23% |
| % Nivel Pérdida | 0.00% | 13.90% | 47.55% | 34.28% | 40.42% | 36.68% | 57.78% | 48.96% | 24.99% | 5.32% | 3.36% | 37.34% |
| Energía Suministrada (GWh) | 0 | 1.08 | 1.77 | 1.43 | 1.12 | 1.04 | 1.74 | 1.48 | 0.93 | 0.75 | 0.82 | 1.3 |
| Energía Facturada (GWh) | 0 | 0.93 | 0.93 | 0.94 | 0.67 | 0.66 | 0.74 | 0.75 | 0.7 | 0.71 | 0.8 | 0.81 |
| Energía Cobrada (GWh) | 0 | 0.89 | 0.95 | 0.85 | 0.63 | 0.79 | 0.59 | 0.76 | 0.93 | 0.67 | 0.69 | 0.98 |
| % Servicio | 98.59% | 98.24% | 95.89% | 97.40% | 99.84% | 98.64% | 98.32% | 98.74% | 99.56% | 96.40% | 92.18% | 99.92% |
| % Sin Servicio | 1.41% | 1.76% | 4.11% | 2.60% | 0.16% | 1.36% | 1.68% | 1.26% | 0.44% | 3.60% | 7.82% | 0.08% |
| Interrupción Programada (Hrs) | 0.00 | 6.00 | 11.00 | 3.00 | 5.00 | 9.00 | 5.00 | 6.00 | 0.00 | 18.00 | 40.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 10.32 | 12.84 | 30.03 | 19.00 | 1.17 | 9.96 | 12.27 | 9.22 | 3.20 | 26.25 | 57.07 | 0.60 |
| Promedio Interrupción Diarias (Hrs) | 0.34 | 0.42 | 0.99 | 0.62 | 0.04 | 0.33 | 0.40 | 0.30 | 0.11 | 0.86 | 1.88 | 0.02 |
Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial).