Circuito KDIE104

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 3808 3801 3797 3795 3799 3793 6356 6330 3480 3470 3462 3431
% Nivel Cobranza 133.23% 94.48% 86.15% 120.23% 74.63% 132.28% 80.81% 103.09% 108.60% 80.75% 109.88% 111.53%
% Nivel Pérdida 24.99% 5.32% 3.36% 37.34% 33.69% 69.88% 44.44% 46.73% 42.60% 44.65% 50.86% 32.70%
Energía Suministrada (GWh) 0.93 0.75 0.82 1.3 1.32 2.83 4.02 4.13 3.74 3.74 3.83 2.64
Energía Facturada (GWh) 0.7 0.71 0.8 0.81 0.87 0.85 2.23 2.2 2.15 2.07 1.88 1.78
Energía Cobrada (GWh) 0.93 0.67 0.69 0.98 0.65 1.13 1.8 2.27 2.33 1.67 2.07 1.98
% Servicio 99.56% 96.40% 92.18% 99.92% 98.57% 97.05% 99.29% 98.00% 98.39% 99.32% 99.98% 96.62%
% Sin Servicio 0.44% 3.60% 7.82% 0.08% 1.43% 2.95% 0.71% 2.00% 1.61% 0.68% 0.02% 3.38%
Interrupción Programada (Hrs) 0.00 18.00 40.00 0.00 6.00 16.00 0.00 0.00 3.00 0.00 0.00 9.00
Interrupción Ejecutada (Hrs) 3.20 26.25 57.07 0.60 10.42 21.51 5.18 14.60 11.72 4.95 0.14 24.64
Promedio Interrupción Diarias (Hrs) 0.11 0.86 1.88 0.02 0.34 0.71 0.17 0.48 0.39 0.16 0.00 0.81
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial).