Circuito KDIE104

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25
Clasificación C C C C C C C C C C A B
Clientes 1024 1024 968 3838 3826 3826 3824 3810 3804 3808 3807 3810
% Nivel Cobranza 0.00% 115.42% 98.47% 82.49% 97.74% 92.58% 95.37% 102.44% 90.27% 94.48% 119.65% 80.45%
% Nivel Pérdida 0.00% 59.27% 44.46% 42.33% 15.84% 40.44% 13.90% 47.55% 34.28% 40.42% 36.68% 57.78%
Energía Suministrada (GWh) 0 1.53 1.26 1.45 1.60 1.61 1.08 1.77 1.43 1.12 1.04 1.74
Energía Facturada (GWh) 0 0.62 0.70 0.84 1.35 0.96 0.93 0.93 0.94 0.67 0.66 0.74
Energía Cobrada (GWh) 0 0.72 0.69 0.69 1.32 0.89 0.89 0.95 0.85 0.63 0.79 0.59
% Servicio 98.74% 96.99% 98.04% 99.63% 99.97% 98.59% 98.24% 95.89% 97.40% 99.84% 98.64% 98.32%
% Sin Servicio 1.26% 3.01% 1.96% 0.37% 0.03% 1.41% 1.76% 4.11% 2.60% 0.16% 1.36% 1.68%
Interrupción Programada (Hrs) 5.00 12.00 9.00 3.00 0.00 0.00 6.00 11.00 3.00 5.00 9.00 5.00
Interrupción Ejecutada (Hrs) 9.04 21.69 14.12 2.68 0.24 10.32 12.84 30.03 19.00 1.17 9.96 12.27
Promedio Interrupción Diarias (Hrs) 0.30 0.71 0.46 0.09 0.01 0.34 0.42 0.99 0.62 0.04 0.33 0.40
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial), CLARO.