Circuito KDIE104

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 3804 3804 3808 3807 3810 3815 3808 3801 3797 3795 3799 3793
% Nivel Cobranza 0.00% 90.27% 94.48% 119.65% 80.45% 100.78% 133.23% 94.48% 86.15% 120.23% 74.63% 132.28%
% Nivel Pérdida 0.00% 34.28% 40.42% 36.68% 57.78% 48.96% 24.99% 5.32% 3.36% 37.34% 33.69% 69.88%
Energía Suministrada (GWh) 0 1.43 1.12 1.04 1.74 1.48 0.93 0.75 0.82 1.3 1.32 2.83
Energía Facturada (GWh) 0 0.94 0.67 0.66 0.74 0.75 0.7 0.71 0.8 0.81 0.87 0.85
Energía Cobrada (GWh) 0 0.85 0.63 0.79 0.59 0.76 0.93 0.67 0.69 0.98 0.65 1.13
% Servicio 95.89% 97.40% 99.84% 98.64% 98.32% 98.74% 99.56% 96.40% 92.18% 99.92% 98.57% 97.05%
% Sin Servicio 4.11% 2.60% 0.16% 1.36% 1.68% 1.26% 0.44% 3.60% 7.82% 0.08% 1.43% 2.95%
Interrupción Programada (Hrs) 11.00 3.00 5.00 9.00 5.00 6.00 0.00 18.00 40.00 0.00 6.00 16.00
Interrupción Ejecutada (Hrs) 30.03 19.00 1.17 9.96 12.27 9.22 3.20 26.25 57.07 0.60 10.42 21.51
Promedio Interrupción Diarias (Hrs) 0.99 0.62 0.04 0.33 0.40 0.30 0.11 0.86 1.88 0.02 0.34 0.71
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial).