Buscar Circuitos Glosario

Circuito KDIE104

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 4984 4910 4907 4907 9331 1031 1024 968 3838 3826 3826 3824
% Nivel Cobranza 91.98% 90.42% 95.64% 95.42% 89.70% 99.92% 115.42% 98.47% 82.49% 97.74% 92.58% 95.37%
% Nivel Pérdida 13.00% 15.92% 19.19% 16.99% 36.27% 63.13% 59.27% 44.46% 42.33% 15.84% 40.44% 13.90%
Energía Suministrada (GWh) 6.12 6.39 6.40 5.44 4.80 1.83 1.53 1.26 1.45 1.60 1.61 1.08
Energía Facturada (GWh) 5.32 5.37 5.17 4.51 3.06 0.67 0.62 0.70 0.84 1.35 0.96 0.93
Energía Cobrada (GWh) 4.90 4.86 4.95 4.31 2.74 0.67 0.72 0.69 0.69 1.32 0.89 0.89
% Servicio 99.46% 99.98% 100.00% 99.90% 99.18% 99.18% 96.99% 98.04% 99.63% 99.97% 98.59% 98.24%
% Sin Servicio 0.54% 0.02% 0.00% 0.10% 0.82% 0.82% 3.01% 1.96% 0.37% 0.03% 1.41% 1.76%
Interrupción Programada (Hrs) 0.00 0.00 4.00 2.00 0.00 0.00 12.00 9.00 3.00 0.00 0.00 6.00
Interrupción Ejecutada (Hrs) 3.92 0.17 0.00 0.71 5.93 5.93 21.69 14.12 2.68 0.24 10.32 12.84
Promedio Interrupción Diarias (Hrs) 0.13 0.01 0.00 0.02 0.20 0.20 0.71 0.46 0.09 0.01 0.34 0.42
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KDIE104
Interrupciones Programadas 1.00
Interrupciones Ejecutadas 0.05
% Ejecución Operativa 5.00%
Detalle de Salidas - Circuito KDIE104
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
09/10/2026 Ejecutada 19:08:12 19:11:09 0.05 FALLA TRANSITORIA //
08/10/2026 Programada 13:00:00 14:00:00 1.00
Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial), CLARO.