Buscar Circuitos Glosario

Circuito KDIE103

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación B B B B B B B B B B B B
Clientes 9160 9160 9150 9118 5673 5652 5618 5618 5581 5541 5525 5502
% Nivel Cobranza 0.00% 94.28% 93.38% 102.57% 91.99% 107.87% 104.99% 102.06% 100.82% 96.68% 95.20% 103.33%
% Nivel Pérdida 0.00% 21.28% 17.82% 17.87% 8.16% 22.80% 4.75% 13.03% 17.44% 12.94% 20.70% 24.19%
Energía Suministrada (GWh) 0 7.65 6.66 6.46 4.20 4.40 4.49 4.95 5.54 5.5 5.85 5.76
Energía Facturada (GWh) 0 6.02 5.47 5.31 3.86 3.40 4.28 4.31 4.57 4.78 4.64 4.37
Energía Cobrada (GWh) 0 5.68 5.11 5.44 3.55 3.66 4.49 4.40 4.61 4.63 4.42 4.51
% Servicio 99.12% 98.76% 98.76% 98.42% 97.73% 99.61% 99.15% 97.71% 99.04% 95.19% 95.70% 98.49%
% Sin Servicio 0.88% 1.24% 1.24% 1.58% 2.27% 0.39% 0.85% 2.29% 0.96% 4.81% 4.30% 1.51%
Interrupción Programada (Hrs) 0.00 0.00 0.00 4.00 3.00 0.00 0.00 6.00 0.00 0.00 0.00 3.00
Interrupción Ejecutada (Hrs) 6.30 8.95 8.95 11.41 16.36 2.78 6.32 16.71 7.01 35.13 31.38 11.00
Promedio Interrupción Diarias (Hrs) 0.21 0.29 0.29 0.38 0.54 0.09 0.21 0.55 0.23 1.15 1.03 0.36
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KDIE103
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.11
% Ejecución Operativa 0%
Detalle de Salidas - Circuito KDIE103
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 12:08:52 12:10:35 0.03 FALLA TRANSITORIA //
06/07/2026 Ejecutada 09:58:55 10:01:38 0.05 FALLA TRANSITORIA //
01/07/2026 Ejecutada 15:30:33 15:32:39 0.03 FALLA TRANSITORIA //
Alameda desde la Pról. 27 de Febrero, Ciudad Agraria, Villa Aura (parcial),Grupo Ramos (Las Caobas), Padilla, S.A, Oficina Técnica de Servicios de Autobuses (OMSA), Los Álamos, El Antillano, El Caliche de Manoguayabo, Bayona (parcial), Paraíso del Caribe.