Circuito KDIE101B

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr18 Mar18 Feb18 Ene18 Dic17 Nov17 Oct17 Sep17 Ago17 Jul17 Jun17 May17
Clasificación B B B B D D D D D D D D
Clientes 0 3705 800 3463 3463 2857 2311 2060 1663 1634 1644 1648
% Nivel Cobranza 0.00% 109.45% 117.68% 60.91% 83.91% 73.38% 84.14% 65.36% 89.49% 95.78% 85.03% 90.96%
% Nivel Pérdida 100.00% 47.64% 46.93% 24.69% 52.39% 60.72% 74.61% 70.63% 81.46% 82.21% 81.02% 82.66%
Energía Suministrada (GWh) 0.84 0.84 0.71 0.88 0.94 0.92 1.07 1.15 1.23 1.2 1.15 1.17
Energía Facturada (GWh) 0 0.44 0.37 0.66 0.45 0.36 0.27 0.34 0.23 0.21 0.22 0.2
Energía Cobrada (GWh) 0 0.48 0.44 0.4 0.38 0.26 0.23 0.22 0.2 0.2 0.18 0.18
% Servicio 0.00% 84.52% 84.18% 85.30% 83.99% 65.73% 57.32% 62.31% 58.87% 55.66% 56.76% 65.39%
% Sin Servicio 0.00% 15.48% 15.82% 14.70% 16.01% 34.27% 42.68% 37.69% 41.13% 44.34% 43.24% 34.61%
Interrupción Programada (Hrs) 0.00 124.00 70.00 70.00 79.00 207.00 257.00 215.00 247.00 257.00 247.00 254.00
Interrupción Ejecutada (Hrs) 0.00 113.02 115.47 107.30 116.87 250.20 311.57 275.13 300.21 323.67 315.67 252.67
Promedio Interrupción Diarias (Hrs) 0.00 3.72 3.80 3.53 3.84 8.23 10.24 9.05 9.87 10.64 10.38 8.31
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Barrio Los Peralejos y Barrio Los Ángeles.