Circuito KDIE101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C A B C C C A A A A A A
Clientes 9345 9345 9333 9349 9402 9467 9504 9587 9614 9639 9650 9616
% Nivel Cobranza 0.00% 94.84% 101.68% 88.25% 108.83% 94.22% 105.89% 110.22% 92.52% 103.84% 90.64% 95.77%
% Nivel Pérdida 0.00% 46.99% 50.79% 42.44% 53.02% 38.85% 41.15% 44.16% 31.60% 30.12% 26.81% 34.54%
Energía Suministrada (GWh) 0 3.71 3.77 3.34 3.54 2.81 3.08 3.32 3.16 2.99 3.07 3.23
Energía Facturada (GWh) 0 1.97 1.85 1.92 1.66 1.72 1.81 1.86 2.16 2.09 2.25 2.12
Energía Cobrada (GWh) 0 1.87 1.88 1.7 1.81 1.62 1.92 2.04 2 2.17 2.04 2.03
% Servicio 99.28% 99.06% 97.89% 99.96% 99.71% 99.96% 99.83% 99.99% 99.91% 97.55% 98.28% 97.77%
% Sin Servicio 0.72% 0.94% 2.11% 0.04% 0.29% 0.04% 0.17% 0.01% 0.09% 2.45% 1.72% 2.23%
Interrupción Programada (Hrs) 0.00 0.00 2.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 5.22 6.89 15.38 0.28 2.11 0.27 1.24 0.06 0.63 17.91 12.55 16.30
Promedio Interrupción Diarias (Hrs) 0.17 0.23 0.51 0.01 0.07 0.01 0.04 0.00 0.02 0.59 0.41 0.54
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.