Circuito KDIE101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 9402 9467 9504 9587 9614 9639 9650 9616 9463 9440 9524 9524
% Nivel Cobranza 108.83% 94.22% 105.89% 110.22% 92.52% 103.84% 90.64% 95.77% 104.97% 87.46% 99.60% 95.01%
% Nivel Pérdida 53.02% 38.85% 41.15% 44.16% 31.60% 30.12% 26.81% 34.54% 33.14% 30.41% 32.19% 38.29%
Energía Suministrada (GWh) 3.54 2.81 3.08 3.32 3.16 2.99 3.07 3.23 3.12 3.03 2.82 3.07
Energía Facturada (GWh) 1.66 1.72 1.81 1.86 2.16 2.09 2.25 2.12 2.09 2.11 1.91 1.9
Energía Cobrada (GWh) 1.81 1.62 1.92 2.04 2 2.17 2.04 2.03 2.19 1.84 1.91 1.8
% Servicio 99.71% 99.96% 99.83% 99.99% 99.91% 97.55% 98.28% 97.77% 99.14% 98.91% 99.43% 99.18%
% Sin Servicio 0.29% 0.04% 0.17% 0.01% 0.09% 2.45% 1.72% 2.23% 0.86% 1.09% 0.57% 0.82%
Interrupción Programada (Hrs) 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.11 0.27 1.24 0.06 0.63 17.91 12.55 16.30 6.27 7.94 4.15 6.02
Promedio Interrupción Diarias (Hrs) 0.07 0.01 0.04 0.00 0.02 0.59 0.41 0.54 0.21 0.26 0.14 0.20
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.