Buscar Circuitos Glosario

Circuito KDIE101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 10896 10896 10859 10859 10804 10815 10788 10858 9290 2765 2765 2762
% Nivel Cobranza 0.00% 83.47% 79.86% 84.22% 84.44% 84.91% 95.64% 88.98% 103.44% 108.69% 94.38% 105.29%
% Nivel Pérdida 0.00% 30.39% 27.75% 46.59% 38.14% 43.99% 41.26% 36.97% 43.84% 81.24% 80.54% 80.71%
Energía Suministrada (GWh) 0 3.70 3.63 4.27 3.40 3.33 3.16 2.88 3.06 3.33 3.45 3.84
Energía Facturada (GWh) 0 2.58 2.62 2.28 2.10 1.87 1.86 1.82 1.72 0.63 0.67 0.74
Energía Cobrada (GWh) 0 2.15 2.09 1.92 1.78 1.58 1.78 1.62 1.78 0.68 0.63 0.78
% Servicio 99.47% 99.60% 99.63% 99.77% 99.79% 99.79% 99.46% 99.31% 98.91% 99.99% 99.89% 99.82%
% Sin Servicio 0.53% 0.40% 0.37% 0.23% 0.21% 0.21% 0.54% 0.69% 1.09% 0.01% 0.11% 0.18%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 3.83 2.91 2.65 1.66 1.50 1.50 3.90 4.94 7.85 0.10 0.80 1.33
Promedio Interrupción Diarias (Hrs) 0.13 0.10 0.09 0.05 0.05 0.05 0.13 0.16 0.26 0.00 0.03 0.04
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KDIE101A
Interrupciones Programadas 0
Interrupciones Ejecutadas 4.12
% Ejecución Operativa 0%
Detalle de Salidas - Circuito KDIE101A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/10/2026 Ejecutada 17:15:54 17:42:32 0.56 FALLA TRANSITORIA // REPOSICIÓN DE JUMPER //
19/10/2026 Ejecutada 11:22:40 11:29:21 0.56 FALLA TRANSITORIA // REPOSICIÓN DE JUMPER //
17/10/2026 Ejecutada 07:45:15 08:11:04 0.43 FALLA TRANSITORIA //
12/10/2026 Ejecutada 11:58:03 14:32:09 2.57 RAMAS SOBRE LÍNEA //
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.