Circuito KDIE101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 10804 10804 10815 10788 10858 9290 2765 2765 2762 2754 2697 2657
% Nivel Cobranza 0.00% 84.44% 84.91% 95.64% 88.98% 103.44% 108.69% 94.38% 105.29% 85.61% 93.93% 102.97%
% Nivel Pérdida 0.00% 38.14% 43.99% 41.26% 36.97% 43.84% 81.24% 80.54% 80.71% 80.98% 83.68% 84.52%
Energía Suministrada (GWh) 0 3.40 3.33 3.16 2.88 3.06 3.33 3.45 3.84 4.07 4.15 4.15
Energía Facturada (GWh) 0 2.10 1.87 1.86 1.82 1.72 0.63 0.67 0.74 0.77 0.68 0.64
Energía Cobrada (GWh) 0 1.78 1.58 1.78 1.62 1.78 0.68 0.63 0.78 0.66 0.64 0.66
% Servicio 99.77% 99.79% 99.79% 99.46% 99.31% 98.91% 99.99% 99.89% 99.82% 96.03% 95.90% 99.28%
% Sin Servicio 0.23% 0.21% 0.21% 0.54% 0.69% 1.09% 0.01% 0.11% 0.18% 3.97% 4.10% 0.72%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 1.66 1.50 1.50 3.90 4.94 7.85 0.10 0.80 1.33 28.99 29.91 5.22
Promedio Interrupción Diarias (Hrs) 0.05 0.05 0.05 0.13 0.16 0.26 0.00 0.03 0.04 0.95 0.98 0.17
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KDIE101A
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.68
% Ejecución Operativa 0%
Detalle de Salidas - Circuito KDIE101A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 21:55:46 22:12:48 0.34 FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE //
07/07/2026 Ejecutada 16:48:57 16:52:11 0.34 FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE //
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.