Circuito KDIE101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C A B C C C A A
Clientes 2762 2762 2754 2697 2657 9345 9333 9349 9402 9467 9504 9587
% Nivel Cobranza 0.00% 105.29% 85.61% 93.93% 102.97% 94.84% 101.68% 88.25% 108.83% 94.22% 105.89% 110.22%
% Nivel Pérdida 0.00% 80.71% 80.98% 83.68% 84.52% 46.99% 50.79% 42.44% 53.02% 38.85% 41.15% 44.16%
Energía Suministrada (GWh) 0 3.84 4.07 4.15 4.15 3.71 3.77 3.34 3.54 2.81 3.08 3.32
Energía Facturada (GWh) 0 0.74 0.77 0.68 0.64 1.97 1.85 1.92 1.66 1.72 1.81 1.86
Energía Cobrada (GWh) 0 0.78 0.66 0.64 0.66 1.87 1.88 1.7 1.81 1.62 1.92 2.04
% Servicio 99.89% 99.82% 96.03% 95.90% 99.28% 99.06% 97.89% 99.96% 99.71% 99.96% 99.83% 99.99%
% Sin Servicio 0.11% 0.18% 3.97% 4.10% 0.72% 0.94% 2.11% 0.04% 0.29% 0.04% 0.17% 0.01%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 1.00 0.00
Interrupción Ejecutada (Hrs) 0.80 1.33 28.99 29.91 5.22 6.89 15.38 0.28 2.11 0.27 1.24 0.06
Promedio Interrupción Diarias (Hrs) 0.03 0.04 0.95 0.98 0.17 0.23 0.51 0.01 0.07 0.01 0.04 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.