Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 2697 2697 2657 9345 9333 9349 9402 9467 9504 9587 9614 9639
% Nivel Cobranza 0.00% 93.93% 102.97% 94.84% 101.68% 88.25% 108.83% 94.22% 105.89% 110.22% 92.52% 103.84%
% Nivel Pérdida 0.00% 83.68% 84.52% 46.99% 50.79% 42.44% 53.02% 38.85% 41.15% 44.16% 31.60% 30.12%
Energía Suministrada (GWh) 0 4.15 4.15 3.71 3.77 3.34 3.54 2.81 3.08 3.32 3.16 2.99
Energía Facturada (GWh) 0 0.68 0.64 1.97 1.85 1.92 1.66 1.72 1.81 1.86 2.16 2.09
Energía Cobrada (GWh) 0 0.64 0.66 1.87 1.88 1.7 1.81 1.62 1.92 2.04 2 2.17
% Servicio 96.03% 95.90% 99.28% 99.06% 97.89% 99.96% 99.71% 99.96% 99.83% 99.99% 99.91% 97.55%
% Sin Servicio 3.97% 4.10% 0.72% 0.94% 2.11% 0.04% 0.29% 0.04% 0.17% 0.01% 0.09% 2.45%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 28.99 29.91 5.22 6.89 15.38 0.28 2.11 0.27 1.24 0.06 0.63 17.91
Promedio Interrupción Diarias (Hrs) 0.95 0.98 0.17 0.23 0.51 0.01 0.07 0.01 0.04 0.00 0.02 0.59
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.