Circuito KDIE101A
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | A | B | C | C | C | A | A | A | A | A | A |
Clientes | 9345 | 9345 | 9333 | 9349 | 9402 | 9467 | 9504 | 9587 | 9614 | 9639 | 9650 | 9616 |
% Nivel Cobranza | 0.00% | 94.84% | 101.68% | 88.25% | 108.83% | 94.22% | 105.89% | 110.22% | 92.52% | 103.84% | 90.64% | 95.77% |
% Nivel Pérdida | 0.00% | 46.99% | 50.79% | 42.44% | 53.02% | 38.85% | 41.15% | 44.16% | 31.60% | 30.12% | 26.81% | 34.54% |
Energía Suministrada (GWh) | 0 | 3.71 | 3.77 | 3.34 | 3.54 | 2.81 | 3.08 | 3.32 | 3.16 | 2.99 | 3.07 | 3.23 |
Energía Facturada (GWh) | 0 | 1.97 | 1.85 | 1.92 | 1.66 | 1.72 | 1.81 | 1.86 | 2.16 | 2.09 | 2.25 | 2.12 |
Energía Cobrada (GWh) | 0 | 1.87 | 1.88 | 1.7 | 1.81 | 1.62 | 1.92 | 2.04 | 2 | 2.17 | 2.04 | 2.03 |
% Servicio | 99.28% | 99.06% | 97.89% | 99.96% | 99.71% | 99.96% | 99.83% | 99.99% | 99.91% | 97.55% | 98.28% | 97.77% |
% Sin Servicio | 0.72% | 0.94% | 2.11% | 0.04% | 0.29% | 0.04% | 0.17% | 0.01% | 0.09% | 2.45% | 1.72% | 2.23% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 2.00 | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 5.22 | 6.89 | 15.38 | 0.28 | 2.11 | 0.27 | 1.24 | 0.06 | 0.63 | 17.91 | 12.55 | 16.30 |
Promedio Interrupción Diarias (Hrs) | 0.17 | 0.23 | 0.51 | 0.01 | 0.07 | 0.01 | 0.04 | 0.00 | 0.02 | 0.59 | 0.41 | 0.54 |
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.