Circuito KDIE101

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 10216 10183 10192 10100 10113 10124 10117 10088 7109 7087 7112 7049
% Nivel Cobranza 110.92% 98.64% 101.23% 105.04% 102.12% 90.31% 93.97% 94.00% 97.43% 93.03% 95.19% 95.18%
% Nivel Pérdida 28.12% 16.60% 16.33% 20.74% 11.65% 42.41% 36.88% 38.71% 35.25% 36.39% 41.51% 21.63%
Energía Suministrada (GWh) 2.81 2.25 2.49 2.67 2.56 4.31 3.89 4.04 3.69 3.69 3.78 2.7
Energía Facturada (GWh) 2.02 1.87 2.08 2.12 2.27 2.48 2.46 2.47 2.39 2.35 2.21 2.11
Energía Cobrada (GWh) 2.24 1.85 2.1 2.23 2.31 2.24 2.31 2.33 2.33 2.18 2.1 2.01
% Servicio 98.67% 99.82% 96.87% 99.90% 98.59% 98.88% 98.72% 98.49% 99.01% 98.72% 99.62% 98.39%
% Sin Servicio 1.33% 0.18% 3.13% 0.10% 1.41% 1.12% 1.28% 1.51% 0.99% 1.28% 0.38% 1.61%
Interrupción Programada (Hrs) 3.00 0.00 22.00 0.00 0.00 0.00 3.00 0.00 3.00 3.00 1.00 0.00
Interrupción Ejecutada (Hrs) 9.69 1.34 22.84 0.71 10.32 8.17 9.33 11.00 7.23 9.33 2.81 11.76
Promedio Interrupción Diarias (Hrs) 0.32 0.04 0.75 0.02 0.34 0.27 0.31 0.36 0.24 0.31 0.09 0.39
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Peralejos, Los Militares, Proyecto Fairbanks, Bo. Los Ángeles, Reparto Samaria, Residencial Monumental, Proyecto Fairbanks, Av. Del Rio.