Buscar Circuitos Glosario

Circuito KDIE101

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación C C C C C C C C C C C C
Clientes 3129 3129 3130 7389 7388 10165 16747 16747 16776 16817 16841 16906
% Nivel Cobranza 0.00% 89.76% 98.36% 99.38% 94.10% 96.97% 104.87% 94.96% 100.03% 92.44% 103.12% 96.02%
% Nivel Pérdida 0.00% 40.63% 32.60% 30.87% 23.31% 18.99% -24.80% -24.08% -22.74% -11.20% -4.14% -16.53%
Energía Suministrada (GWh) 0 2.35 1.78 2.72 2.43 2.61 2.87 2.92 3.34 3.65 3.72 3.14
Energía Facturada (GWh) 0 1.40 1.20 1.88 1.86 2.11 3.58 3.63 4.10 4.06 3.88 3.65
Energía Cobrada (GWh) 0 1.25 1.18 1.87 1.76 2.05 3.76 3.45 4.10 3.75 4 3.51
% Servicio 97.59% 95.80% 95.80% 96.65% 96.02% 95.50% 97.05% 95.78% 95.85% 98.80% 96.10% 96.46%
% Sin Servicio 2.41% 4.20% 4.20% 3.35% 3.98% 4.50% 2.95% 4.22% 4.15% 1.20% 3.90% 3.54%
Interrupción Programada (Hrs) 8.00 18.00 18.00 17.00 12.00 14.00 12.00 13.00 20.00 6.00 12.00 14.00
Interrupción Ejecutada (Hrs) 17.39 30.22 30.22 24.15 28.65 32.41 21.93 30.81 30.27 8.74 28.44 25.82
Promedio Interrupción Diarias (Hrs) 0.57 0.99 0.99 0.79 0.94 1.07 0.72 1.01 1.00 0.29 0.94 0.85
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito KDIE101
Interrupciones Programadas 4.00
Interrupciones Ejecutadas 5.91
% Ejecución Operativa 147.75%
Detalle de Salidas - Circuito KDIE101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
07/07/2026 Ejecutada 18:59:21 19:05:11 0.10 FALLA TRANSITORIA //
03/07/2026 Programada 06:00:00 08:00:00 2.00 EN MANTENIMIENTO //
03/07/2026 Ejecutada 06:04:24 08:59:24 2.92 EN MANTENIMIENTO //
01/07/2026 Programada 08:00:00 10:00:00 2.00 EN MANTENIMIENTO //
01/07/2026 Ejecutada 08:04:09 10:57:29 2.89 EN MANTENIMIENTO //
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Reparto Samaria, Res. Monumental, Av. Del Rio.