Circuito KDIE101

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25
Clasificación C C C C C C C C C C A B
Clientes 7389 7389 7388 10165 16747 16747 16776 16817 16841 16906 10176 10180
% Nivel Cobranza 0.00% 99.38% 94.10% 96.97% 104.87% 94.96% 100.03% 92.44% 103.12% 96.02% 90.69% 99.88%
% Nivel Pérdida 0.00% 30.87% 23.31% 18.99% -24.80% -24.08% -22.74% -11.20% -4.14% -16.53% 14.13% 31.66%
Energía Suministrada (GWh) 0 2.72 2.43 2.61 2.87 2.92 3.34 3.65 3.72 3.14 3 3.05
Energía Facturada (GWh) 0 1.88 1.86 2.11 3.58 3.63 4.10 4.06 3.88 3.65 2.58 2.09
Energía Cobrada (GWh) 0 1.87 1.76 2.05 3.76 3.45 4.10 3.75 4 3.51 2.34 2.08
% Servicio 95.86% 96.65% 96.02% 95.50% 97.05% 95.78% 95.85% 98.80% 96.10% 96.46% 97.41% 98.22%
% Sin Servicio 4.14% 3.35% 3.98% 4.50% 2.95% 4.22% 4.15% 1.20% 3.90% 3.54% 2.59% 1.78%
Interrupción Programada (Hrs) 12.00 17.00 12.00 14.00 12.00 13.00 20.00 6.00 12.00 14.00 17.00 4.00
Interrupción Ejecutada (Hrs) 29.81 24.15 28.65 32.41 21.93 30.81 30.27 8.74 28.44 25.82 18.94 12.98
Promedio Interrupción Diarias (Hrs) 0.98 0.79 0.94 1.07 0.72 1.01 1.00 0.29 0.94 0.85 0.62 0.43
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Reparto Samaria, Res. Monumental, Av. Del Rio.