Circuito KDIE101

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24
Clasificación C C C A B C C C A A A A
Clientes 16841 16841 16906 10176 10180 10187 10216 10183 10192 10100 10113 10124
% Nivel Cobranza 0.00% 103.12% 96.02% 90.69% 99.88% 83.28% 110.92% 98.64% 101.23% 105.04% 102.12% 90.31%
% Nivel Pérdida 0.00% -4.14% -16.53% 14.13% 31.66% 20.30% 28.12% 16.60% 16.33% 20.74% 11.65% 42.41%
Energía Suministrada (GWh) 0 3.72 3.14 3 3.05 2.64 2.81 2.25 2.49 2.67 2.56 4.31
Energía Facturada (GWh) 0 3.88 3.65 2.58 2.09 2.1 2.02 1.87 2.08 2.12 2.27 2.48
Energía Cobrada (GWh) 0 4 3.51 2.34 2.08 1.75 2.24 1.85 2.1 2.23 2.31 2.24
% Servicio 98.80% 96.10% 96.46% 97.41% 98.22% 98.98% 98.67% 99.82% 96.87% 99.90% 98.59% 98.88%
% Sin Servicio 1.20% 3.90% 3.54% 2.59% 1.78% 1.02% 1.33% 0.18% 3.13% 0.10% 1.41% 1.12%
Interrupción Programada (Hrs) 6.00 12.00 14.00 17.00 4.00 3.00 3.00 0.00 22.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.74 28.44 25.82 18.94 12.98 7.41 9.69 1.34 22.84 0.71 10.32 8.17
Promedio Interrupción Diarias (Hrs) 0.29 0.94 0.85 0.62 0.43 0.24 0.32 0.04 0.75 0.02 0.34 0.27
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Peralejos, Los Militares, Proyecto Fairbanks, Bo. Los Ángeles, Reparto Samaria, Residencial Monumental, Proyecto Fairbanks, Av. Del Rio.