Circuito KDIE101
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A | A | A | A | A | A | A |
Clientes | 10216 | 10183 | 10192 | 10100 | 10113 | 10124 | 10117 | 10088 | 7109 | 7087 | 7112 | 7049 |
% Nivel Cobranza | 110.92% | 98.64% | 101.23% | 105.04% | 102.12% | 90.31% | 93.97% | 94.00% | 97.43% | 93.03% | 95.19% | 95.18% |
% Nivel Pérdida | 28.12% | 16.60% | 16.33% | 20.74% | 11.65% | 42.41% | 36.88% | 38.71% | 35.25% | 36.39% | 41.51% | 21.63% |
Energía Suministrada (GWh) | 2.81 | 2.25 | 2.49 | 2.67 | 2.56 | 4.31 | 3.89 | 4.04 | 3.69 | 3.69 | 3.78 | 2.7 |
Energía Facturada (GWh) | 2.02 | 1.87 | 2.08 | 2.12 | 2.27 | 2.48 | 2.46 | 2.47 | 2.39 | 2.35 | 2.21 | 2.11 |
Energía Cobrada (GWh) | 2.24 | 1.85 | 2.1 | 2.23 | 2.31 | 2.24 | 2.31 | 2.33 | 2.33 | 2.18 | 2.1 | 2.01 |
% Servicio | 98.67% | 99.82% | 96.87% | 99.90% | 98.59% | 98.88% | 98.72% | 98.49% | 99.01% | 98.72% | 99.62% | 98.39% |
% Sin Servicio | 1.33% | 0.18% | 3.13% | 0.10% | 1.41% | 1.12% | 1.28% | 1.51% | 0.99% | 1.28% | 0.38% | 1.61% |
Interrupción Programada (Hrs) | 3.00 | 0.00 | 22.00 | 0.00 | 0.00 | 0.00 | 3.00 | 0.00 | 3.00 | 3.00 | 1.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 9.69 | 1.34 | 22.84 | 0.71 | 10.32 | 8.17 | 9.33 | 11.00 | 7.23 | 9.33 | 2.81 | 11.76 |
Promedio Interrupción Diarias (Hrs) | 0.32 | 0.04 | 0.75 | 0.02 | 0.34 | 0.27 | 0.31 | 0.36 | 0.24 | 0.31 | 0.09 | 0.39 |
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Peralejos, Los Militares, Proyecto Fairbanks, Bo. Los Ángeles, Reparto Samaria, Residencial Monumental, Proyecto Fairbanks, Av. Del Rio.