Circuito JUCO101B

Distribuidora EdeSur - Provincia Pedernales


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación D D D D D A B D D D D A
Clientes 2073 2073 2073 2073 2073 2073 2064 2088 2116 2122 2119 2109
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 80.80% 77.78% 77.15% 85.03% 76.53% 76.75% 75.03%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 74.99% 74.15% 73.61% 72.62% 66.77% 69.66% 72.81%
Energía Suministrada (GWh) 0 0 0 0 0 1.48 1.44 1.33 1.28 1.13 1.29 1.35
Energía Facturada (GWh) 0 0 0 0 0 0.37 0.37 0.35 0.35 0.38 0.39 0.37
Energía Cobrada (GWh) 0 0 0 0 0 0.3 0.29 0.27 0.3 0.29 0.3 0.28
% Servicio 98.46% 93.95% 97.62% 95.85% 98.77% 97.24% 99.08% 98.12% 99.09% 97.83% 98.62% 97.95%
% Sin Servicio 1.54% 6.05% 2.38% 4.15% 1.23% 2.76% 0.92% 1.88% 0.91% 2.17% 1.38% 2.05%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 3.00
Interrupción Ejecutada (Hrs) 11.21 44.17 17.38 30.33 8.96 20.15 6.70 13.71 6.66 15.82 10.07 14.96
Promedio Interrupción Diarias (Hrs) 0.37 1.45 0.57 1.00 0.29 0.66 0.22 0.45 0.22 0.52 0.33 0.49
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Ojeda, Los Patos, Los Blancos, Caletón, Las Merceditas, Paraíso, San Rafael.