Circuito JDOL01
Distribuidora EdeEste - Provincia San Pedro De Macoris
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 3052 | 3052 | 3011 | 2970 | 2980 | 2979 | 3007 | 3032 | 3167 | 3125 | 3115 | 3109 |
| % Nivel Cobranza | 0.00% | 91.84% | 89.90% | 111.16% | 74.52% | 101.58% | 117.63% | 114.67% | 105.96% | 109.89% | 97.97% | 91.91% |
| % Nivel Pérdida | 0.00% | 32.26% | 30.94% | 37.44% | 10.55% | 34.14% | 31.45% | 30.92% | 14.12% | 14.50% | 19.85% | 21.36% |
| Energía Suministrada (GWh) | 0 | 4.16 | 3.65 | 3.50 | 2.95 | 3.41 | 3.38 | 3.60 | 3.68 | 3.78 | 4.51 | 4.38 |
| Energía Facturada (GWh) | 0 | 2.82 | 2.52 | 2.19 | 2.64 | 2.25 | 2.32 | 2.49 | 3.16 | 3.23 | 3.62 | 3.45 |
| Energía Cobrada (GWh) | 0 | 2.59 | 2.27 | 2.43 | 1.97 | 2.28 | 2.73 | 2.86 | 3.35 | 3.55 | 3.54 | 3.17 |
| % Servicio | 99.50% | 98.99% | 98.31% | 99.77% | 97.61% | 98.55% | 99.42% | 98.45% | 98.19% | 99.32% | 99.82% | 99.91% |
| % Sin Servicio | 0.50% | 1.01% | 1.69% | 0.23% | 2.39% | 1.45% | 0.58% | 1.55% | 1.81% | 0.68% | 0.18% | 0.09% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 5.00 | 6.00 | 18.00 | 6.00 | 6.00 | 0.00 | 0.00 | 5.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 3.60 | 7.28 | 12.13 | 1.65 | 17.18 | 10.43 | 4.33 | 11.28 | 13.23 | 4.95 | 1.35 | 0.65 |
| Promedio Interrupción Diarias (Hrs) | 0.12 | 0.24 | 0.40 | 0.05 | 0.56 | 0.34 | 0.14 | 0.37 | 0.44 | 0.16 | 0.04 | 0.02 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 26/06/2026 | Ejecutada | 20:14:00 | 20:21:00 | 0.12 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 25/06/2026 | Ejecutada | 20:53:00 | 21:12:00 | 1.75 | TRANSMISION - SALIDA DE LINEA 138 KV // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 25/06/2026 | Ejecutada | 13:23:00 | 13:27:00 | 1.75 | TRANSMISION - SALIDA DE LINEA 138 KV // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 25/06/2026 | Ejecutada | 11:57:00 | 13:19:00 | 1.75 | TRANSMISION - SALIDA DE LINEA 138 KV // DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |