Circuito JDOL01

Distribuidora EdeEste - Provincia San Pedro De Macoris


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación A A A A A A A A A A A A
Clientes 3090 3095 3085 3090 3086 3091 3091 3129 3148 3082 3036 3027
% Nivel Cobranza 94.60% 110.80% 102.38% 112.65% 118.16% 109.58% 104.70% 110.25% 113.38% 96.04% 114.32% 98.42%
% Nivel Pérdida 20.45% 13.26% 8.34% 17.20% 5.47% 13.16% 8.40% 17.60% 10.03% 2.88% 7.17% 7.16%
Energía Suministrada (GWh) 3.49 2.89 3.23 3.35 3.12 3.87 3.74 4.10 3.92 3.48 3.25 3.22
Energía Facturada (GWh) 2.78 2.51 2.96 2.77 2.95 3.36 3.42 3.38 3.52 3.38 3.01 2.99
Energía Cobrada (GWh) 2.63 2.78 3.03 3.12 3.49 3.68 3.58 3.73 4.00 3.24 3.44 2.94
% Servicio 99.94% 98.89% 96.17% 99.61% 93.76% 97.93% 99.19% 98.36% 99.20% 98.77% 99.70% 98.17%
% Sin Servicio 0.06% 1.11% 3.83% 0.39% 6.24% 2.07% 0.81% 1.64% 0.80% 1.23% 0.30% 1.83%
Interrupción Programada (Hrs) 5.00 25.00 16.00 4.00 9.00 0.00 0.00 0.00 5.00 12.00 7.00 16.00
Interrupción Ejecutada (Hrs) 0.45 8.10 27.93 2.87 45.55 15.08 5.88 11.95 5.87 9.00 2.20 13.38
Promedio Interrupción Diarias (Hrs) 0.01 0.27 0.92 0.09 1.50 0.50 0.19 0.39 0.19 0.30 0.07 0.44
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

JUAN DOLIO (Calles/Avenidas: 10, 11, 12, 13, 14, 17, 18, A San Pedro De Macorís, Autopista, Boulevard, Camino A La Playa, Central (Principal/Boulevard), Del Este, El Metro, El Tanque, Hipocampo, Los Caminos, Mar Del Sol, Plaza Real, Rio Mar, Villas Del Mar)