Circuito JARA103HAT

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación C C C C C C C C C C C C
Clientes 1267 1267 1257 1257 1255 1250 1243 1229 1242 1237 1228 1229
% Nivel Cobranza 0.00% 77.72% 85.08% 80.81% 89.84% 78.00% 93.76% 77.12% 78.32% 78.70% 82.35% 87.52%
% Nivel Pérdida 0.00% 39.04% 44.03% 40.56% 42.41% 34.86% 43.67% 28.46% 35.92% 40.61% 35.74% 39.20%
Energía Suministrada (GWh) 0 0.49 0.47 0.43 0.42 0.38 0.4 0.35 0.41 0.41 0.39 0.42
Energía Facturada (GWh) 0 0.3 0.26 0.25 0.24 0.25 0.23 0.25 0.26 0.25 0.25 0.26
Energía Cobrada (GWh) 0 0.23 0.22 0.21 0.22 0.19 0.21 0.19 0.21 0.19 0.21 0.22
% Servicio 97.29% 95.14% 97.34% 94.67% 94.76% 92.82% 98.79% 96.86% 99.61% 99.64% 96.13% 95.87%
% Sin Servicio 2.71% 4.86% 2.66% 5.33% 5.24% 7.18% 1.21% 3.14% 0.39% 0.36% 3.87% 4.13%
Interrupción Programada (Hrs) 0.00 45.00 65.00 66.00 55.00 40.00 6.00 0.00 0.00 0.00 10.00 15.00
Interrupción Ejecutada (Hrs) 19.52 34.97 19.13 38.35 37.72 51.67 8.72 22.62 2.78 2.66 28.26 30.16
Promedio Interrupción Diarias (Hrs) 0.64 1.15 0.63 1.26 1.24 1.70 0.29 0.74 0.09 0.09 0.93 0.99
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito JARA103HAT
Interrupciones Programadas 0
Interrupciones Ejecutadas 8.13
% Ejecución Operativa 0%
Detalle de Salidas - Circuito JARA103HAT
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
22/10/2026 Ejecutada 17:03:32 17:08:14 0.17 CAUSA DESCONOCIDA // PERDIDA DE TENSION DE LA 12.5
22/10/2026 Ejecutada 12:41:55 12:47:40 0.17 CAUSA DESCONOCIDA // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 18:35:38 18:39:03 1.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 18:24:11 18:34:27 1.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 15:41:31 15:51:46 1.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 10:25:57 10:31:45 1.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
20/10/2026 Ejecutada 09:39:21 10:24:50 1.25 FALLAS ETED, DISPARO DE LINEA TRANSMISION // PERDIDA DE TENSION DE LA 12.5
19/10/2026 Ejecutada 20:48:52 20:56:22 0.24 ACTUACION BAJA FRECUENCIA (81) // PERDIDA DE TENSION DE LA 12.5
19/10/2026 Ejecutada 20:40:48 20:47:44 0.24 ACTUACION BAJA FRECUENCIA (81) // PERDIDA DE TENSION DE LA 12.5
17/10/2026 Ejecutada 11:12:36 11:16:28 0.25 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
17/10/2026 Ejecutada 11:07:15 11:11:27 0.25 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
17/10/2026 Ejecutada 10:39:45 10:42:50 0.25 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
17/10/2026 Ejecutada 05:38:36 05:42:21 0.25 DISPARO DESCONOCIDO // PERDIDA DE TENSION DE LA 12.5
15/10/2026 Ejecutada 13:16:08 13:19:47 0.06 DISPARO DESCONOCIDO
Hatillo, Entrada Piedra Blanca de Hatillo, Carretera El Crucero.