Circuito JARA103HAT

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C C C C C C C C C C C C
Clientes 1210 1210 1210 1209 1203 1192 1174 1186 1186 1198 1196 1192
% Nivel Cobranza 0.00% 93.11% 93.36% 101.19% 96.97% 91.55% 96.21% 92.26% 3.40% 103.25% 88.91% 95.06%
% Nivel Pérdida 0.00% 48.54% 52.30% 52.58% 53.91% 46.70% 51.60% 56.12% 56.63% 54.17% 53.47% 52.56%
Energía Suministrada (GWh) 0 0.39 0.4 0.39 0.39 0.34 0.38 0.39 0.39 0.39 0.38 0.39
Energía Facturada (GWh) 0 0.2 0.19 0.18 0.18 0.18 0.18 0.17 0.17 0.18 0.18 0.19
Energía Cobrada (GWh) 0 0.19 0.18 0.19 0.18 0.17 0.18 0.16 0.01 0.18 0.16 0.18
% Servicio 97.30% 98.58% 97.96% 98.75% 97.24% 97.21% 90.44% 97.22% 97.33% 97.66% 96.56% 97.12%
% Sin Servicio 2.70% 1.42% 2.04% 1.25% 2.76% 2.79% 9.56% 2.78% 2.67% 2.34% 3.44% 2.88%
Interrupción Programada (Hrs) 0.00 0.00 11.00 5.00 0.00 21.00 71.00 16.00 24.00 8.00 18.00 17.00
Interrupción Ejecutada (Hrs) 19.71 10.39 14.91 9.11 20.18 20.39 69.78 20.29 19.47 17.05 25.12 21.01
Promedio Interrupción Diarias (Hrs) 0.65 0.34 0.49 0.30 0.66 0.67 2.29 0.67 0.64 0.56 0.83 0.69
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Hatillo, Entrada Piedra Blanca de Hatillo, Carretera El Crucero.