Circuito JARA103HAT

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C C C C C C
Clientes 1237 1237 1228 1229 1224 1213 1224 1210 1210 1209 1203 1192
% Nivel Cobranza 0.00% 78.70% 82.35% 87.52% 85.48% 96.91% 91.95% 93.11% 93.36% 101.19% 96.97% 91.55%
% Nivel Pérdida 0.00% 40.61% 35.74% 39.20% 37.53% 52.24% 51.84% 48.54% 52.30% 52.58% 53.91% 46.70%
Energía Suministrada (GWh) 0 0.41 0.39 0.42 0.41 0.45 0.44 0.39 0.4 0.39 0.39 0.34
Energía Facturada (GWh) 0 0.25 0.25 0.26 0.26 0.22 0.21 0.2 0.19 0.18 0.18 0.18
Energía Cobrada (GWh) 0 0.19 0.21 0.22 0.22 0.21 0.19 0.19 0.18 0.19 0.18 0.17
% Servicio 99.61% 99.64% 96.13% 95.87% 96.41% 95.75% 97.30% 98.58% 97.96% 98.75% 97.24% 97.21%
% Sin Servicio 0.39% 0.36% 3.87% 4.13% 3.59% 4.25% 2.70% 1.42% 2.04% 1.25% 2.76% 2.79%
Interrupción Programada (Hrs) 0.00 0.00 10.00 15.00 15.00 18.00 0.00 0.00 11.00 5.00 0.00 21.00
Interrupción Ejecutada (Hrs) 2.78 2.66 28.26 30.16 26.23 31.03 19.71 10.39 14.91 9.11 20.18 20.39
Promedio Interrupción Diarias (Hrs) 0.09 0.09 0.93 0.99 0.86 1.02 0.65 0.34 0.49 0.30 0.66 0.67
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Hatillo, Entrada Piedra Blanca de Hatillo, Carretera El Crucero.