Circuito JARA102COL
Distribuidora EdeNorte - Provincia La Vega
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 7728 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 | 7738 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 97.04% | 99.25% | 97.43% | 98.67% | 97.41% | 99.58% | 99.87% | 98.19% | 97.51% | 99.46% | 98.58% | 97.35% |
| % Sin Servicio | 2.96% | 0.75% | 2.57% | 1.33% | 2.59% | 0.42% | 0.13% | 1.81% | 2.49% | 0.54% | 1.42% | 2.65% |
| Interrupción Programada (Hrs) | 6.00 | 0.00 | 10.00 | 6.00 | 0.00 | 0.00 | 0.00 | 0.00 | 5.00 | 0.00 | 6.00 | 5.00 |
| Interrupción Ejecutada (Hrs) | 21.31 | 5.41 | 18.53 | 9.57 | 18.63 | 3.00 | 0.96 | 13.24 | 18.20 | 3.91 | 10.36 | 19.33 |
| Promedio Interrupción Diarias (Hrs) | 0.70 | 0.18 | 0.61 | 0.31 | 0.61 | 0.10 | 0.03 | 0.44 | 0.60 | 0.13 | 0.34 | 0.64 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 08/07/2026 | Ejecutada | 21:29:18 | 21:33:26 | 0.21 | DISPARO DESCONOCIDO |
| 08/07/2026 | Ejecutada | 20:08:56 | 20:13:30 | 0.21 | DISPARO DESCONOCIDO |
| 08/07/2026 | Ejecutada | 16:06:38 | 16:10:47 | 0.21 | DISPARO DESCONOCIDO |
| 07/07/2026 | Ejecutada | 20:54:15 | 20:57:40 | 0.4 | ACTUACION BAJA FRECUENCIA (81) // DISPARO DESCONOCIDO // MANTENIMIENTO REDES |
| 07/07/2026 | Ejecutada | 17:48:10 | 17:53:26 | 0.4 | ACTUACION BAJA FRECUENCIA (81) // DISPARO DESCONOCIDO // MANTENIMIENTO REDES |
| 07/07/2026 | Ejecutada | 12:29:44 | 12:33:58 | 0.4 | ACTUACION BAJA FRECUENCIA (81) // DISPARO DESCONOCIDO // MANTENIMIENTO REDES |
| 07/07/2026 | Ejecutada | 10:24:30 | 10:28:14 | 0.4 | ACTUACION BAJA FRECUENCIA (81) // DISPARO DESCONOCIDO // MANTENIMIENTO REDES |
| 07/07/2026 | Ejecutada | 07:34:04 | 07:41:34 | 0.4 | ACTUACION BAJA FRECUENCIA (81) // DISPARO DESCONOCIDO // MANTENIMIENTO REDES |
| 05/07/2026 | Ejecutada | 13:45:35 | 13:52:25 | 0.2 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN FUSIBLE |
| 05/07/2026 | Ejecutada | 13:36:57 | 13:41:57 | 0.2 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN FUSIBLE |
| 04/07/2026 | Ejecutada | 16:06:28 | 16:19:12 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 04/07/2026 | Ejecutada | 16:00:47 | 16:05:30 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 04/07/2026 | Ejecutada | 08:32:42 | 15:43:15 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 04/07/2026 | Ejecutada | 07:35:49 | 08:31:35 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 04/07/2026 | Ejecutada | 06:57:22 | 07:35:49 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 04/07/2026 | Ejecutada | 06:49:52 | 06:55:23 | 9.13 | ARBOLES Y RAMA SOBRE LINEA // CORRECTIVO EN CONDUCTOR DE FASE // PERDIDA DE TENSION DE LA 12.5 |
| 01/07/2026 | Ejecutada | 14:50:43 | 15:03:08 | 0.21 | PERDIDA DE TENSION DE LA 12.5 |