Circuito JARA102

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24
Clasificación B B B B B B B B B B A B
Clientes 15920 15920 15869 9951 15364 15364 15354 15358 15321 15244 0 15088
% Nivel Cobranza 0.00% 103.55% 91.76% 97.67% 105.77% 2.03% 106.74% 91.03% 93.83% 100.31% 89.00% 97.29%
% Nivel Pérdida 0.00% 21.49% 12.10% 22.19% 26.40% 8.40% 17.64% 9.94% 20.63% 18.78% 16.86% 21.23%
Energía Suministrada (GWh) 0 3.94 3.48 4.01 4.1 3.45 3.96 3.8 4.26 3.97 3.63 3.62
Energía Facturada (GWh) 0 3.09 3.06 3.12 3.02 3.16 3.26 3.43 3.38 3.23 3.02 2.85
Energía Cobrada (GWh) 0 3.2 2.8 3.05 3.19 0.06 3.48 3.12 3.17 3.24 2.69 2.78
% Servicio 97.33% 99.00% 99.86% 99.92% 99.86% 98.77% 98.72% 98.65% 99.42% 97.37% 0.00% 98.73%
% Sin Servicio 2.67% 1.00% 0.14% 0.08% 0.14% 1.23% 1.28% 1.35% 0.58% 2.63% 0.00% 1.27%
Interrupción Programada (Hrs) 38.00 18.00 0.00 0.00 7.00 7.00 4.00 5.00 10.00 6.00 0.00 5.00
Interrupción Ejecutada (Hrs) 19.51 7.30 0.99 0.60 1.03 9.01 9.36 9.83 4.22 19.22 0.00 9.24
Promedio Interrupción Diarias (Hrs) 0.64 0.24 0.03 0.02 0.03 0.30 0.31 0.32 0.14 0.63 0.00 0.30
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El Salto (Pedregal), Pedregal, Larga (Pedregal), Proyecto Yerba Buena, Salto Baiguate, Sabaneta, Carretera Al Rancho, Carretera La Joya, Carretera Al Rancho Baiguate, Urb. El Dorado Parcial, Pinar Dorado, Avenida Victor Capellan, Hamaca de Dios, Palo Blanco Parcial, Colonia Japonesa, Urb. Medina 2, Don Bosco, Centro del Pueblo parcial, Gaston F. Deligne.