Circuito JARA102

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación B B B B B B B B B B B B
Clientes 16397 16397 16355 16336 16285 16202 16184 16148 16044 16003 15920 15869
% Nivel Cobranza 0.00% 106.22% 99.07% 107.30% 93.97% 86.63% 99.85% 93.14% 98.05% 101.30% 103.55% 91.76%
% Nivel Pérdida 0.00% 24.41% 16.50% 18.57% 14.68% 22.77% 26.61% 20.98% 23.47% 15.11% 21.49% 12.10%
Energía Suministrada (GWh) 0 4.15 4.07 4.43 4.54 4.98 4.72 4.23 4.08 3.65 3.94 3.48
Energía Facturada (GWh) 0 3.14 3.4 3.61 3.87 3.85 3.46 3.34 3.12 3.1 3.09 3.06
Energía Cobrada (GWh) 0 3.33 3.37 3.87 3.64 3.33 3.46 3.11 3.06 3.14 3.2 2.8
% Servicio 99.66% 99.94% 98.29% 97.72% 99.65% 98.81% 97.42% 99.18% 97.78% 97.33% 99.00% 99.86%
% Sin Servicio 0.34% 0.06% 1.71% 2.28% 0.35% 1.19% 2.58% 0.82% 2.22% 2.67% 1.00% 0.14%
Interrupción Programada (Hrs) 0.00 0.00 0.00 5.00 0.00 6.00 5.00 20.00 21.00 38.00 18.00 0.00
Interrupción Ejecutada (Hrs) 2.48 0.45 12.45 16.67 2.52 8.67 18.81 6.01 16.17 19.51 7.30 0.99
Promedio Interrupción Diarias (Hrs) 0.08 0.01 0.41 0.55 0.08 0.29 0.62 0.20 0.53 0.64 0.24 0.03
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

El Salto (Pedregal), Pedregal, Larga (Pedregal), Proyecto Yerba Buena, Salto Baiguate, Sabaneta, Carretera Al Rancho, Carretera La Joya, Carretera Al Rancho Baiguate, Urb. El Dorado Parcial, Pinar Dorado, Avenida Victor Capellan, Hamaca de Dios, Palo Blanco Parcial, Colonia Japonesa, Urb. Medina 2, Don Bosco, Centro del Pueblo parcial, Gaston F. Deligne.