Circuito INVI02
Distribuidora EdeEste - Provincia Santo Domingo
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 8295 | 8295 | 8254 | 8171 | 8142 | 8214 | 8244 | 8182 | 8124 | 8099 | 8141 | 8089 |
| % Nivel Cobranza | 0.00% | 90.62% | 89.00% | 89.67% | 103.08% | 92.05% | 97.23% | 106.58% | 105.66% | 101.43% | 92.56% | 88.96% |
| % Nivel Pérdida | 0.00% | 40.80% | 41.78% | 38.90% | 38.14% | 26.43% | 30.66% | 33.84% | 32.38% | 33.41% | 36.70% | 39.76% |
| Energía Suministrada (GWh) | 0 | 5.41 | 5.06 | 4.31 | 3.87 | 3.40 | 3.76 | 4.00 | 4.13 | 4.74 | 5.16 | 5.24 |
| Energía Facturada (GWh) | 0 | 3.20 | 2.94 | 2.64 | 2.40 | 2.50 | 2.60 | 2.65 | 2.79 | 3.16 | 3.26 | 3.16 |
| Energía Cobrada (GWh) | 0 | 2.90 | 2.62 | 2.36 | 2.47 | 2.30 | 2.53 | 2.82 | 2.95 | 3.20 | 3.02 | 2.81 |
| % Servicio | 99.44% | 99.74% | 99.16% | 99.90% | 99.84% | 97.44% | 99.10% | 99.79% | 97.76% | 99.11% | 99.96% | 99.45% |
| % Sin Servicio | 0.56% | 0.26% | 0.84% | 0.10% | 0.16% | 2.56% | 0.90% | 0.21% | 2.24% | 0.89% | 0.04% | 0.55% |
| Interrupción Programada (Hrs) | 6.00 | 0.00 | 1.00 | 0.00 | 3.00 | 1.00 | 10.00 | 0.00 | 4.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 4.05 | 1.87 | 6.07 | 0.73 | 1.15 | 18.40 | 6.47 | 1.57 | 16.37 | 6.50 | 0.32 | 3.98 |
| Promedio Interrupción Diarias (Hrs) | 0.13 | 0.06 | 0.20 | 0.02 | 0.04 | 0.60 | 0.21 | 0.05 | 0.54 | 0.21 | 0.01 | 0.13 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 15/08/2026 | Ejecutada | 15:58:00 | 16:42:00 | 0.73 | DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 13/08/2026 | Ejecutada | 10:42:00 | 11:09:00 | 0.68 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 13/08/2026 | Ejecutada | 04:17:00 | 04:31:00 | 0.68 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA // DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 11/08/2026 | Ejecutada | 15:46:00 | 15:54:00 | 0.13 | DISTRIBUCION (DISPARO/AVERIAS) - JUMPER MT ABIERTO |
| 09/08/2026 | Ejecutada | 14:22:00 | 15:00:00 | 0.63 | DISTRIBUCION (DISPARO/AVERIAS) - RECORRIDO DE LINEA (NO FALLAS) |