Buscar Circuitos Glosario

Circuito IMBE103MUR

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 741 741 741 737 736 728 931 930 928 926 924 915
% Nivel Cobranza 0.00% 75.78% 81.22% 75.76% 90.14% 86.89% 82.66% 96.30% 82.73% 85.66% 96.20% 78.02%
% Nivel Pérdida 0.00% 62.27% 62.59% 53.12% 59.87% 50.93% 47.15% 52.52% 49.20% 53.74% 55.79% 56.48%
Energía Suministrada (GWh) 0 0.43 0.41 0.33 0.34 0.29 0.35 0.37 0.36 0.41 0.41 0.42
Energía Facturada (GWh) 0 0.16 0.15 0.15 0.14 0.14 0.19 0.17 0.18 0.19 0.18 0.18
Energía Cobrada (GWh) 0 0.12 0.13 0.12 0.12 0.12 0.15 0.17 0.15 0.16 0.17 0.14
% Servicio 95.43% 93.05% 93.59% 89.77% 97.31% 91.15% 95.98% 92.97% 91.31% 94.15% 94.66% 92.17%
% Sin Servicio 4.57% 6.95% 6.41% 10.23% 2.69% 8.85% 4.02% 7.03% 8.69% 5.85% 5.34% 7.83%
Interrupción Programada (Hrs) 65.00 65.00 61.00 39.00 6.00 54.00 36.00 54.00 60.00 29.00 10.00 31.00
Interrupción Ejecutada (Hrs) 32.87 50.03 46.18 73.69 19.34 63.71 28.97 52.32 63.46 42.69 39.00 57.14
Promedio Interrupción Diarias (Hrs) 1.08 1.64 1.52 2.42 0.64 2.09 0.95 1.72 2.09 1.40 1.28 1.88
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito IMBE103MUR
Interrupciones Programadas 15
Interrupciones Ejecutadas 4.87
% Ejecución Operativa 32.47%
Detalle de Salidas - Circuito IMBE103MUR
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 09:00:00 14:00:00 5 OTROS
20/08/2026 Ejecutada 09:07:58 13:59:58 4.87 OTROS
18/08/2026 Programada 08:00:00 13:00:00 5
14/08/2026 Programada 12:00:00 17:00:00 5
Murazo, El Túnel, El Lirial, Cañada Bonita.