Circuito IMBE103GUA

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 907 907 899 895 895 892 897 891 883 872 863 855
% Nivel Cobranza 0.00% 84.49% 84.09% 76.79% 103.26% 85.92% 90.26% 98.42% 84.02% 94.57% 87.47% 93.38%
% Nivel Pérdida 0.00% 49.20% 49.47% 40.47% 51.05% 35.84% 43.20% 48.43% 43.54% 50.54% 50.68% 54.12%
Energía Suministrada (GWh) 0 0.27 0.27 0.21 0.22 0.19 0.23 0.24 0.23 0.26 0.26 0.27
Energía Facturada (GWh) 0 0.14 0.13 0.13 0.11 0.12 0.13 0.12 0.13 0.13 0.13 0.13
Energía Cobrada (GWh) 0 0.12 0.11 0.1 0.11 0.1 0.12 0.12 0.11 0.12 0.11 0.12
% Servicio 96.55% 92.90% 92.67% 93.02% 98.77% 97.12% 98.91% 99.03% 96.76% 97.06% 92.29% 91.15%
% Sin Servicio 3.45% 7.10% 7.33% 6.98% 1.23% 2.88% 1.09% 0.97% 3.24% 2.94% 7.71% 8.85%
Interrupción Programada (Hrs) 65.00 60.00 58.00 44.00 0.00 5.00 5.00 11.00 10.00 11.00 35.00 53.00
Interrupción Ejecutada (Hrs) 24.82 51.15 52.78 50.28 8.84 20.76 7.82 7.22 23.63 21.44 56.26 64.63
Promedio Interrupción Diarias (Hrs) 0.82 1.68 1.74 1.65 0.29 0.68 0.26 0.24 0.78 0.70 1.85 2.12
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito IMBE103GUA
Interrupciones Programadas 15
Interrupciones Ejecutadas 10.90
% Ejecución Operativa 72.67%
Detalle de Salidas - Circuito IMBE103GUA
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 09:00:00 14:00:00 5 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 15:24:34 15:58:42 5.45 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
20/08/2026 Ejecutada 09:08:03 14:00:51 5.45 CORRECTIVO EN CONDUCTOR DE FASE // OTROS
18/08/2026 Programada 08:00:00 13:00:00 5
14/08/2026 Programada 12:00:00 17:00:00 5
Gualete, Gran Diablo.