Circuito IMBE103

Distribuidora EdeNorte - Provincia Puerto Plata


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación B B B B B B B B B B B B
Clientes 13522 13522 14379 14290 14246 14214 14696 14694 14663 14577 2403 14633
% Nivel Cobranza 0.00% 96.80% 95.03% 88.78% 96.04% 81.79% 96.96% 93.16% 96.77% 93.44% 92.99% 102.51%
% Nivel Pérdida 0.00% 21.68% 18.17% 20.83% 30.03% 21.20% 30.53% 21.46% 26.88% 14.98% 17.77% 27.92%
Energía Suministrada (GWh) 0 3.23 3.36 3.49 3.58 3.22 3.17 2.78 2.88 2.48 2.68 2.9
Energía Facturada (GWh) 0 2.53 2.75 2.76 2.51 2.54 2.2 2.18 2.11 2.11 2.2 2.09
Energía Cobrada (GWh) 0 2.45 2.61 2.45 2.41 2.08 2.13 2.04 2.04 1.97 2.05 2.14
% Servicio 98.36% 98.84% 97.43% 96.42% 99.99% 97.41% 99.01% 99.99% 99.24% 99.66% 98.88% 100.00%
% Sin Servicio 1.64% 1.16% 2.57% 3.58% 0.01% 2.59% 0.99% 0.01% 0.76% 0.34% 1.12% 0.00%
Interrupción Programada (Hrs) 0.00 6.00 0.00 5.00 0.00 0.00 6.00 4.00 0.00 0.00 8.00 0.00
Interrupción Ejecutada (Hrs) 11.97 8.50 18.77 26.10 0.06 18.89 7.24 0.07 5.55 2.48 8.19 0.00
Promedio Interrupción Diarias (Hrs) 0.39 0.28 0.62 0.86 0.00 0.62 0.24 0.00 0.18 0.08 0.27 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Baraguana, Barrio Invi, Media Luna, Guananico, Cabía, Las Mariposas, La Cabirma, Rincon Caliente, Fundacion, Olla grande, El Mamey Los Hidalgo, Llanos de Perez, La China, Quebrada Honda, Altamira, El Túnel, El Murazo, La Atravezada, El Lirial, Gualete, Gran Diablo, Cañada Bonita, Lado Palmar grande, La Atravesada, Lado Rio Grande, La Escalera, El Limón, El Aguacate, Altamira, Fundacion, Quita Sueño, Palo de Guerra, Palo Amarillo, Lado La Jagua, Los Llanos, Lado el Mamey Altamira, Navas, Marmolejos, La Jagua, Bajabonico Arriba, Ranchito de los Peralta.