Circuito HNUV104
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C | C | C | C | C | C | C |
| Clientes | 12655 | 12655 | 12707 | 12640 | 12666 | 15487 | 15446 | 15446 | 15451 | 15396 | 15384 | 15365 |
| % Nivel Cobranza | 0.00% | 79.40% | 97.07% | 95.39% | 94.16% | 91.73% | 96.91% | 95.22% | 101.86% | 92.27% | 100.40% | 93.52% |
| % Nivel Pérdida | 0.00% | 44.87% | 43.56% | 40.94% | 36.59% | 36.62% | 38.07% | 40.75% | 41.16% | 41.85% | 46.81% | 47.60% |
| Energía Suministrada (GWh) | 0 | 7.56 | 6.34 | 5.93 | 5.32 | 5.81 | 6.28 | 6.53 | 7.33 | 7.95 | 8.42 | 7.74 |
| Energía Facturada (GWh) | 0 | 4.17 | 3.58 | 3.50 | 3.37 | 3.68 | 3.89 | 3.87 | 4.31 | 4.62 | 4.48 | 4.06 |
| Energía Cobrada (GWh) | 0 | 3.31 | 3.47 | 3.34 | 3.17 | 3.38 | 3.77 | 3.68 | 4.40 | 4.26 | 4.5 | 3.79 |
| % Servicio | 99.30% | 99.84% | 99.84% | 97.82% | 98.45% | 99.18% | 98.51% | 98.00% | 98.10% | 98.40% | 98.53% | 98.20% |
| % Sin Servicio | 0.70% | 0.16% | 0.16% | 2.18% | 1.55% | 0.82% | 1.49% | 2.00% | 1.90% | 1.60% | 1.47% | 1.80% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 3.00 | 6.00 | 3.00 | 6.00 | 3.00 | 3.00 | 10.00 |
| Interrupción Ejecutada (Hrs) | 5.06 | 1.18 | 1.18 | 15.72 | 11.17 | 5.88 | 11.09 | 14.57 | 13.85 | 11.69 | 10.72 | 13.15 |
| Promedio Interrupción Diarias (Hrs) | 0.17 | 0.04 | 0.04 | 0.52 | 0.37 | 0.19 | 0.36 | 0.48 | 0.46 | 0.38 | 0.35 | 0.43 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 04/07/2026 | Programada | 08:00:00 | 11:00:00 | 3.00 | TRASVASE DE CARGA // |
| 04/07/2026 | Ejecutada | 08:28:49 | 11:46:00 | 3.29 | TRASVASE DE CARGA // |
| 02/07/2026 | Ejecutada | 15:57:56 | 16:19:25 | 0.36 | FALLA TRANSITORIA // |
| 28/06/2026 | Ejecutada | 13:55:17 | 14:31:37 | 0.61 | REPOSICIÓN DE JUMPER // |
| 27/06/2026 | Ejecutada | 17:46:57 | 17:54:30 | 1.81 | DETERIORO // DETERIORO // FALLA TRANSITORIA |
| 27/06/2026 | Ejecutada | 17:04:07 | 17:19:42 | 1.81 | DETERIORO // DETERIORO // FALLA TRANSITORIA |
| 27/06/2026 | Ejecutada | 15:38:11 | 17:03:26 | 1.81 | DETERIORO // DETERIORO // FALLA TRANSITORIA |