Circuito HNUV103
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | A | B | C | C | C | A | A |
| Clientes | 9972 | 9972 | 10021 | 10059 | 10090 | 10100 | 10148 | 10164 | 10178 | 10194 | 10246 | 13977 |
| % Nivel Cobranza | 0.00% | 110.10% | 90.22% | 95.01% | 94.48% | 96.47% | 101.43% | 91.69% | 101.80% | 88.54% | 97.47% | 116.67% |
| % Nivel Pérdida | 0.00% | 52.68% | 52.79% | 54.84% | 57.20% | 49.53% | 57.55% | 46.66% | 54.28% | 44.30% | 53.54% | 53.59% |
| Energía Suministrada (GWh) | 0 | 5.48 | 5.99 | 6.29 | 5.9 | 5.27 | 5.4 | 4.7 | 5.05 | 3.8 | 4.68 | 6.43 |
| Energía Facturada (GWh) | 0 | 2.59 | 2.83 | 2.84 | 2.52 | 2.66 | 2.29 | 2.51 | 2.31 | 2.12 | 2.17 | 2.99 |
| Energía Cobrada (GWh) | 0 | 2.85 | 2.55 | 2.7 | 2.39 | 2.56 | 2.32 | 2.3 | 2.35 | 1.88 | 2.12 | 3.48 |
| % Servicio | 98.67% | 99.42% | 97.94% | 98.04% | 98.81% | 99.09% | 98.02% | 99.46% | 99.65% | 96.44% | 93.05% | 98.97% |
| % Sin Servicio | 1.33% | 0.58% | 2.06% | 1.96% | 1.19% | 0.91% | 1.98% | 0.54% | 0.35% | 3.56% | 6.95% | 1.03% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 3.00 | 6.00 | 10.00 | 4.00 | 10.00 | 0.00 | 0.00 | 18.00 | 49.00 | 10.00 |
| Interrupción Ejecutada (Hrs) | 9.69 | 4.20 | 15.05 | 14.33 | 8.66 | 6.61 | 14.43 | 3.93 | 2.54 | 26.00 | 50.77 | 7.51 |
| Promedio Interrupción Diarias (Hrs) | 0.32 | 0.14 | 0.49 | 0.47 | 0.28 | 0.22 | 0.47 | 0.13 | 0.08 | 0.85 | 1.67 | 0.25 |
Herrera (parcial), Res. Los Divinos, Barrio Paraíso, Buenos Aires de Herrera (parcial), Av. Isabel Aguiar desde la Subestación hasta la C/Aguisa 4, Zona Industrial de Herrera (Parcial), Res. Anaconda, Pollos Victorina, Barrio Josué.