Buscar Circuitos Glosario

Circuito HNUV101A

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 1193 1193 1187 1191 1185 1184 1185 1185 1184 1182 1179 1185
% Nivel Cobranza 0.00% 101.33% 88.75% 110.48% 92.11% 107.44% 115.86% 91.38% 108.95% 90.77% 93.67% 109.07%
% Nivel Pérdida 0.00% 19.93% 13.31% 9.61% -4.46% 3.73% 2.54% -1.32% 2.52% 4.93% 18.10% 18.68%
Energía Suministrada (GWh) 0 0.80 0.67 0.66 0.58 0.65 0.71 0.74 0.82 0.9 0.96 0.87
Energía Facturada (GWh) 0 0.64 0.58 0.59 0.60 0.62 0.70 0.75 0.80 0.85 0.78 0.71
Energía Cobrada (GWh) 0 0.65 0.52 0.66 0.56 0.67 0.80 0.69 0.88 0.77 0.73 0.77
% Servicio 99.88% 99.64% 99.64% 99.94% 100.00% 100.00% 100.00% 100.00% 99.68% 99.98% 99.98% 100.00%
% Sin Servicio 0.12% 0.36% 0.36% 0.06% 0.00% 0.00% 0.00% 0.00% 0.32% 0.02% 0.02% 0.00%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.88 2.60 2.60 0.40 0.00 0.00 0.00 0.00 2.31 0.12 0.18 0.00
Promedio Interrupción Diarias (Hrs) 0.03 0.09 0.09 0.01 0.00 0.00 0.00 0.00 0.08 0.00 0.01 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito HNUV101A
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.30
% Ejecución Operativa 0%
Detalle de Salidas - Circuito HNUV101A
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
23/06/2026 Ejecutada 14:38:22 14:56:12 0.30 FALLA TRANSITORIA //
Los Cacicazgos (parcial)