Buscar Circuitos Glosario

Circuito HNUV101

Distribuidora EdeSur - Provincia Santo Domingo


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación A A A A A A A A A A A A
Clientes 215 215 211 211 209 209 208 208 207 208 205 205
% Nivel Cobranza 0.00% 92.78% 97.45% 104.68% 83.64% 112.31% 93.99% 103.43% 103.28% 99.89% 103.59% 99.08%
% Nivel Pérdida 0.00% 1.93% -4.97% 7.00% -7.53% -15.81% -4.65% 6.71% -0.42% -2.53% 5.90% 6.31%
Energía Suministrada (GWh) 0 4.25 3.77 4.16 3.54 3.59 4.68 4.79 4.76 4.94 5.09 5.11
Energía Facturada (GWh) 0 4.17 3.95 3.87 3.80 4.16 4.89 4.47 4.78 5.07 4.79 4.79
Energía Cobrada (GWh) 0 3.87 3.85 4.05 3.18 4.67 4.60 4.63 4.93 5.06 4.96 4.74
% Servicio 99.42% 99.89% 99.89% 99.88% 98.57% 99.93% 99.89% 99.36% 99.34% 99.69% 99.70% 99.63%
% Sin Servicio 0.58% 0.11% 0.11% 0.12% 1.43% 0.07% 0.11% 0.64% 0.66% 0.31% 0.30% 0.37%
Interrupción Programada (Hrs) 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 7.00
Interrupción Ejecutada (Hrs) 4.17 0.78 0.78 0.88 10.29 0.48 0.84 4.70 4.82 2.25 2.20 2.72
Promedio Interrupción Diarias (Hrs) 0.14 0.03 0.03 0.03 0.34 0.02 0.03 0.15 0.16 0.07 0.07 0.09
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito HNUV101
Interrupciones Programadas 0
Interrupciones Ejecutadas 2.73
% Ejecución Operativa 0%
Detalle de Salidas - Circuito HNUV101
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
19/06/2026 Ejecutada 15:04:57 16:31:52 1.45 TRASVASE DE CARGA //
16/06/2026 Ejecutada 22:03:03 23:19:59 1.28 ACCIDENTE VEHICULAR //
Zona Industrial de Herrera (Parcial): C/A, B, F, D, Pról.. Rómulo Betancourt desde la Luperón hasta la Isabel Aguiar, Central, Pról.. Mirador Sur, Banco De Reservas, Luperón desde la Rómulo Betancourt hasta la F, Los Cacicazgos (parcial), Ministerio de Defensa, Plaza de la Bandera, Plásticos del Caribe.