Buscar Circuitos Glosario

Circuito HNAC01

Distribuidora EdeEste - Provincia Santo Domingo


Mes-Año Abr14 Mar14 Feb14 Ene14 Dic13 Nov13 Oct13 Sep13 Ago13 Jul13 Jun13 May13
Clasificación A A A A A A A A A A A A
Clientes 1 1 1 1 1 1 1 1 1 1 1 1
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.12% 99.93% 0.04% 0.00% 130.37%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% -11.86% -0.40% -5.60% 5.46% 1.29% 99.97% 99.96%
Energía Suministrada (GWh) 0 0 0 0 0 1.10 1.23 1.23 1.3 1.23 1.21 1.13
Energía Facturada (GWh) 0 0 0 0 0 1.23 1.23 1.3 1.23 1.21 0 0
Energía Cobrada (GWh) 0 0 0 0 0 1.23 1.23 1.30 1.23 0 0 0.00
% Servicio 99.01% 99.49% 100.00% 100.00% 100.00% 100.00% 99.06% 100.00% 100.00% 99.15% 100.00% 100.00%
% Sin Servicio 0.99% 0.51% 0.00% 0.00% 0.00% 0.00% 0.94% 0.00% 0.00% 0.85% 0.00% 0.00%
Interrupción Programada (Hrs) 8.00 0.00 0.00 0.00 0.00 0.00 11.00 0.00 0.00 5.00 0.00 7.00
Interrupción Ejecutada (Hrs) 7.25 3.75 0.00 0.00 0.00 0.00 6.85 0.00 0.00 6.22 0.00 0.00
Promedio Interrupción Diarias (Hrs) 0.24 0.12 0.00 0.00 0.00 0.00 0.23 0.00 0.00 0.20 0.00 0.00
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito HNAC01
Interrupciones Programadas 0
Interrupciones Ejecutadas 1.47
% Ejecución Operativa 0%
Detalle de Salidas - Circuito HNAC01
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/04/2014 Ejecutada 13:20:00 14:48:00 1.47 SALIDA DE LINEA
HIELOS NACIONALES