Circuito HAMY01
Distribuidora EdeEste - Provincia Hato Mayor
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A | A | A | A | A | A | A |
| Clientes | 12659 | 12659 | 12606 | 12646 | 12619 | 12588 | 12527 | 12499 | 12501 | 11878 | 12330 | 12312 |
| % Nivel Cobranza | 0.00% | 89.31% | 86.70% | 105.16% | 101.83% | 96.64% | 105.12% | 100.00% | 100.20% | 98.61% | 90.80% | 104.23% |
| % Nivel Pérdida | 0.00% | 53.50% | 45.25% | 47.51% | 37.14% | 42.77% | 46.47% | 44.09% | 49.16% | 48.46% | 50.16% | 48.98% |
| Energía Suministrada (GWh) | 0 | 6.36 | 5.06 | 4.82 | 4.11 | 4.73 | 5.10 | 5.26 | 6.20 | 6.02 | 6.52 | 6.19 |
| Energía Facturada (GWh) | 0 | 2.96 | 2.77 | 2.53 | 2.58 | 2.71 | 2.73 | 2.94 | 3.15 | 3.10 | 3.25 | 3.16 |
| Energía Cobrada (GWh) | 0 | 2.64 | 2.40 | 2.66 | 2.63 | 2.62 | 2.87 | 2.94 | 3.16 | 3.06 | 2.95 | 3.29 |
| % Servicio | 97.46% | 99.29% | 99.36% | 98.95% | 99.51% | 99.22% | 99.51% | 97.62% | 98.45% | 99.31% | 98.92% | 98.77% |
| % Sin Servicio | 2.54% | 0.71% | 0.64% | 1.05% | 0.49% | 0.78% | 0.49% | 2.38% | 1.55% | 0.69% | 1.08% | 1.23% |
| Interrupción Programada (Hrs) | 13.00 | 0.00 | 0.00 | 0.00 | 6.00 | 12.00 | 0.00 | 0.00 | 0.00 | 0.00 | 6.00 | 5.00 |
| Interrupción Ejecutada (Hrs) | 18.30 | 5.10 | 4.58 | 7.58 | 3.53 | 5.63 | 3.65 | 17.37 | 11.32 | 5.03 | 7.92 | 9.00 |
| Promedio Interrupción Diarias (Hrs) | 0.60 | 0.17 | 0.15 | 0.25 | 0.12 | 0.19 | 0.12 | 0.57 | 0.37 | 0.17 | 0.26 | 0.30 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 02/07/2026 | Ejecutada | 16:49:00 | 18:14:00 | 1.68 | TRANSMISION - SALIDA DE LINEA 69 KV // TRANSMISION - FACILITAR TRABAJOS TRANSMISION |
| 02/07/2026 | Ejecutada | 12:01:00 | 12:17:00 | 1.68 | TRANSMISION - SALIDA DE LINEA 69 KV // TRANSMISION - FACILITAR TRABAJOS TRANSMISION |
| 29/06/2026 | Ejecutada | 09:21:00 | 09:48:00 | 0.45 | DISTRIBUCION (DISPARO/AVERIAS) - LINEA MT EN EL SUELO |
| 27/06/2026 | Ejecutada | 19:03:00 | 19:07:00 | 0.07 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |
| 25/06/2026 | Ejecutada | 03:58:00 | 04:18:00 | 0.33 | DISTRIBUCION (DISPARO/AVERIAS) - FALLA TRANSITORIA |