Buscar Circuitos Glosario

Circuito GUAN102

Distribuidora EdeSur - Provincia San Juan


Mes-Año Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25
Clasificación C C C C C C C C C C C C
Clientes 2217 2217 2212 2208 2193 2186 2180 2175 2175 2169 2145 2127
% Nivel Cobranza 0.00% 89.81% 93.17% 84.50% 105.30% 95.91% 106.14% 97.52% 93.07% 93.91% 153.98% 201.75%
% Nivel Pérdida 0.00% 34.70% 34.47% 27.51% 40.01% 28.41% 38.50% 34.69% 34.45% 33.44% 35.84% 38.01%
Energía Suministrada (GWh) 0 0.66 0.65 0.62 0.63 0.56 0.63 0.64 0.63 0.66 0.68 0.7
Energía Facturada (GWh) 0 0.43 0.43 0.45 0.38 0.4 0.39 0.42 0.42 0.44 0.43 0.43
Energía Cobrada (GWh) 0 0.39 0.40 0.38 0.40 0.38 0.41 0.40 0.39 0.42 0.67 0.88
% Servicio 99.22% 97.56% 97.98% 97.98% 98.52% 98.22% 99.97% 99.26% 98.74% 98.46% 99.43% 98.84%
% Sin Servicio 0.78% 2.44% 2.02% 2.02% 1.48% 1.78% 0.03% 0.74% 1.26% 1.54% 0.57% 1.16%
Interrupción Programada (Hrs) 3.00 16.00 11.00 11.00 9.00 3.00 0.00 4.00 3.00 3.00 3.00 0.00
Interrupción Ejecutada (Hrs) 5.60 17.57 14.54 14.54 10.63 12.80 0.22 5.50 9.18 11.24 4.14 8.45
Promedio Interrupción Diarias (Hrs) 0.18 0.58 0.48 0.48 0.35 0.42 0.01 0.18 0.30 0.37 0.14 0.28
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito GUAN102
Interrupciones Programadas 3.00
Interrupciones Ejecutadas 5.26
% Ejecución Operativa 175.33%
Detalle de Salidas - Circuito GUAN102
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
20/08/2026 Programada 10:00:00 13:00:00 3.00 MANTENIMIENTO ETED //
20/08/2026 Ejecutada 09:52:45 14:37:00 4.74 MANTENIMIENTO ETED //
18/08/2026 Ejecutada 02:56:15 03:00:30 0.07 FALLA TRANSITORIA //
16/08/2026 Ejecutada 10:19:15 10:46:15 0.45 REPOSICIÓN DE JUMPER //
Antena de Telemicro, La Vereda, Coco del Yaque, Loma del Yaque, Buena Vista del Yaque, Palmar, Arroyo Cano, Bohechío, Los Frios, Buena Vista