Circuito GUAN101

Distribuidora EdeSur - Provincia San Juan


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 1930 1922 1927 1968 2019 2020 2012 2016 1993 1986 1988 1995
% Nivel Cobranza 87.84% 79.95% 98.65% 99.00% 89.71% 86.56% 85.45% 89.44% 90.90% 84.74% 94.70% 86.24%
% Nivel Pérdida 44.05% 37.95% 37.43% 41.84% 34.04% 38.28% 40.56% 43.41% 40.54% 36.40% 40.45% 31.37%
Energía Suministrada (GWh) 0.5 0.42 0.45 0.46 0.43 0.5 0.5 0.52 0.5 0.5 0.49 0.48
Energía Facturada (GWh) 0.28 0.26 0.28 0.27 0.29 0.31 0.3 0.29 0.29 0.32 0.29 0.33
Energía Cobrada (GWh) 0.25 0.21 0.28 0.26 0.26 0.27 0.25 0.26 0.27 0.27 0.28 0.29
% Servicio 98.84% 96.77% 93.20% 99.70% 98.97% 99.62% 98.94% 98.83% 98.35% 99.07% 99.39% 99.97%
% Sin Servicio 1.16% 3.23% 6.80% 0.30% 1.03% 0.38% 1.06% 1.17% 1.65% 0.93% 0.61% 0.03%
Interrupción Programada (Hrs) 5.00 18.00 41.00 0.00 4.00 4.00 0.00 7.00 4.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 8.44 23.61 49.64 2.21 7.53 2.75 7.74 8.53 12.06 6.77 4.48 0.19
Promedio Interrupción Diarias (Hrs) 0.28 0.78 1.63 0.07 0.25 0.09 0.25 0.28 0.40 0.22 0.15 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Guanito, Sabana Alta, Los Bancos