Circuito GUAN101

Distribuidora EdeSur - Provincia San Juan


Mes-Año Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25
Clasificación C C C C C C C A B C C C
Clientes 1915 1908 1908 1895 1898 1926 1930 1925 1928 1928 1930 1922
% Nivel Cobranza 0.00% 0.00% 101.22% 102.39% 88.68% 92.22% 92.91% 106.25% 93.13% 84.14% 87.84% 79.95%
% Nivel Pérdida 0.00% 0.00% 41.11% 36.67% 41.95% 39.67% 45.00% 49.57% 41.87% 41.76% 44.05% 37.95%
Energía Suministrada (GWh) 0 0 0.47 0.49 0.52 0.54 0.56 0.53 0.5 0.5 0.5 0.42
Energía Facturada (GWh) 0 0 0.28 0.31 0.3 0.32 0.31 0.27 0.29 0.29 0.28 0.26
Energía Cobrada (GWh) 0 0 0.28 0.32 0.27 0.3 0.29 0.29 0.27 0.24 0.25 0.21
% Servicio 99.98% 99.21% 98.20% 99.62% 99.14% 97.88% 99.01% 100.00% 99.12% 99.69% 98.84% 96.77%
% Sin Servicio 0.02% 0.79% 1.80% 0.38% 0.86% 2.12% 0.99% 0.00% 0.88% 0.31% 1.16% 3.23%
Interrupción Programada (Hrs) 0.00 4.00 6.00 3.00 6.00 0.00 3.00 0.00 3.00 0.00 5.00 18.00
Interrupción Ejecutada (Hrs) 0.15 5.85 13.17 2.77 6.31 15.50 7.24 0.00 6.40 2.28 8.44 23.61
Promedio Interrupción Diarias (Hrs) 0.00 0.19 0.43 0.09 0.21 0.51 0.24 0.00 0.21 0.07 0.28 0.78
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Guanito, Sabana Alta, Los Bancos