Circuito GUAG501

Distribuidora EdeNorte - Provincia La Vega


Mes-Año Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25
Clasificación D D D D D D D D D D D D
Clientes 192 210 210 210 210 210 210 210 210 210 210 210
% Nivel Cobranza 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% Nivel Pérdida 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Energía Suministrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Facturada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
Energía Cobrada (GWh) 0 0 0 0 0 0 0 0 0 0 0 0
% Servicio 96.15% 95.57% 92.88% 99.96% 98.33% 98.50% 99.99% 99.82% 100.00% 99.40% 97.68% 98.93%
% Sin Servicio 3.85% 4.43% 7.12% 0.04% 1.67% 1.50% 0.01% 0.18% 0.00% 0.60% 2.32% 1.07%
Interrupción Programada (Hrs) 65.00 50.00 43.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 18.00 0.00
Interrupción Ejecutada (Hrs) 27.72 31.90 51.23 0.27 12.00 10.78 0.10 1.32 0.00 4.35 16.93 7.83
Promedio Interrupción Diarias (Hrs) 0.91 1.05 1.68 0.01 0.39 0.35 0.00 0.04 0.00 0.14 0.56 0.26
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito GUAG501
Interrupciones Programadas 15
Interrupciones Ejecutadas 4.46
% Ejecución Operativa 29.73%
Detalle de Salidas - Circuito GUAG501
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
08/07/2026 Programada 12:00:00 17:00:00 5
06/07/2026 Programada 13:00:00 18:00:00 5
04/07/2026 Ejecutada 03:31:16 03:38:20 0.27 DISPARO DESCONOCIDO // POSTE ROTO
04/07/2026 Ejecutada 01:21:59 01:27:22 0.27 DISPARO DESCONOCIDO // POSTE ROTO
04/07/2026 Ejecutada 01:18:08 01:21:56 0.27 DISPARO DESCONOCIDO // POSTE ROTO
03/07/2026 Ejecutada 17:27:07 17:47:25 0.39 CAUSA DESCONOCIDA
03/07/2026 Ejecutada 17:23:53 17:27:00 0.39 CAUSA DESCONOCIDA
02/07/2026 Programada 08:00:00 13:00:00 5 OTROS
02/07/2026 Ejecutada 08:06:35 10:58:48 2.87 OTROS
Guaigui, Guarey, Guanabano.