Circuito GRBO104
Distribuidora EdeSur - Provincia San Cristóbal
| Mes-Año | Jun26 | May26 | Abr26 | Mar26 | Feb26 | Ene26 | Dic25 | Nov25 | Oct25 | Sep25 | Ago25 | Jul25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación | B | B | B | B | B | B | B | B | B | B | B | B |
| Clientes | 732 | 732 | 736 | 720 | 707 | 716 | 711 | 711 | 716 | 715 | 683 | 638 |
| % Nivel Cobranza | 0.00% | 96.13% | 83.75% | 131.38% | 89.36% | 100.43% | 89.89% | 99.10% | 105.95% | 85.87% | 103.65% | 105.72% |
| % Nivel Pérdida | 0.00% | 14.99% | 5.63% | 18.34% | 0.55% | -5.23% | 12.48% | 15.71% | 13.79% | 12.67% | 19.80% | 18.75% |
| Energía Suministrada (GWh) | 0 | 5.03 | 4.46 | 4.80 | 4.05 | 4.31 | 5.47 | 5.30 | 5.37 | 5.46 | 5.65 | 5.63 |
| Energía Facturada (GWh) | 0 | 4.28 | 4.21 | 3.92 | 4.03 | 4.54 | 4.78 | 4.46 | 4.63 | 4.77 | 4.53 | 4.57 |
| Energía Cobrada (GWh) | 0 | 4.11 | 3.52 | 5.15 | 3.60 | 4.56 | 4.30 | 4.42 | 4.91 | 4.09 | 4.7 | 4.83 |
| % Servicio | 98.71% | 99.90% | 99.90% | 98.01% | 98.61% | 98.77% | 99.10% | 95.63% | 97.82% | 98.72% | 99.03% | 99.15% |
| % Sin Servicio | 1.29% | 0.10% | 0.10% | 1.99% | 1.39% | 1.23% | 0.90% | 4.37% | 2.18% | 1.28% | 0.97% | 0.85% |
| Interrupción Programada (Hrs) | 3.00 | 0.00 | 0.00 | 7.00 | 0.00 | 6.00 | 0.00 | 12.00 | 3.00 | 4.00 | 3.00 | 3.00 |
| Interrupción Ejecutada (Hrs) | 9.27 | 0.72 | 0.72 | 14.33 | 9.98 | 8.86 | 6.71 | 31.90 | 15.92 | 9.35 | 7.06 | 6.19 |
| Promedio Interrupción Diarias (Hrs) | 0.30 | 0.02 | 0.02 | 0.47 | 0.33 | 0.29 | 0.22 | 1.05 | 0.52 | 0.31 | 0.23 | 0.20 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 06/07/2026 | Ejecutada | 16:40:46 | 17:09:44 | 0.56 | FALLA TRANSITORIA // REPOSICIÓN DE JUMPER // |
| 06/07/2026 | Ejecutada | 16:17:26 | 16:22:09 | 0.56 | FALLA TRANSITORIA // REPOSICIÓN DE JUMPER // |
| 04/07/2026 | Ejecutada | 16:47:42 | 16:50:01 | 0.04 | FALLA TRANSITORIA // |
| 02/07/2026 | Ejecutada | 10:34:53 | 12:08:51 | 1.62 | DETERIORO // DETERIORO // |
| 02/07/2026 | Ejecutada | 10:31:54 | 10:34:53 | 1.62 | DETERIORO // DETERIORO // |
| 01/07/2026 | Ejecutada | 09:27:58 | 09:35:51 | 0.16 | FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE // |
| 01/07/2026 | Ejecutada | 02:28:56 | 02:30:50 | 0.16 | FALLA TRANSITORIA // CORRECTIVO EN FUSIBLE // |