Circuito GRBO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación C C A A A A A A A A A A
Clientes 16386 16374 16437 16447 16544 16568 16583 16590 11979 12036 12094 12052
% Nivel Cobranza 123.59% 81.78% 91.93% 105.21% 91.91% 114.69% 79.35% 89.67% 102.34% 88.46% 99.06% 93.73%
% Nivel Pérdida 59.02% 44.59% 47.55% 52.16% 37.79% 51.98% 45.41% 51.22% 52.87% 48.30% 53.28% 44.74%
Energía Suministrada (GWh) 6.39 5.04 5.51 5.95 5.61 7.07 6.6 7.41 6.97 6.57 6.66 5.82
Energía Facturada (GWh) 2.62 2.79 2.89 2.85 3.49 3.39 3.6 3.61 3.28 3.4 3.11 3.22
Energía Cobrada (GWh) 3.23 2.28 2.66 3 3.21 3.89 2.86 3.24 3.36 3 3.08 3.02
% Servicio 99.26% 96.98% 92.36% 97.84% 96.91% 94.64% 95.38% 95.44% 97.31% 93.88% 99.45% 98.40%
% Sin Servicio 0.74% 3.02% 7.64% 2.16% 3.09% 5.36% 4.62% 4.56% 2.69% 6.12% 0.55% 1.60%
Interrupción Programada (Hrs) 4.00 18.00 40.00 3.00 6.00 8.00 0.00 4.00 0.00 8.00 4.00 0.00
Interrupción Ejecutada (Hrs) 5.38 22.06 55.77 15.75 22.54 39.11 33.72 33.28 19.64 44.71 3.99 11.67
Promedio Interrupción Diarias (Hrs) 0.18 0.73 1.83 0.52 0.74 1.29 1.11 1.09 0.65 1.47 0.13 0.38
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.