Circuito GRBO103
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 | Sep24 | Ago24 | Jul24 | Jun24 | May24 | Abr24 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A | A | A | A | A | A | A |
Clientes | 16386 | 16374 | 16437 | 16447 | 16544 | 16568 | 16583 | 16590 | 11979 | 12036 | 12094 | 12052 |
% Nivel Cobranza | 123.59% | 81.78% | 91.93% | 105.21% | 91.91% | 114.69% | 79.35% | 89.67% | 102.34% | 88.46% | 99.06% | 93.73% |
% Nivel Pérdida | 59.02% | 44.59% | 47.55% | 52.16% | 37.79% | 51.98% | 45.41% | 51.22% | 52.87% | 48.30% | 53.28% | 44.74% |
Energía Suministrada (GWh) | 6.39 | 5.04 | 5.51 | 5.95 | 5.61 | 7.07 | 6.6 | 7.41 | 6.97 | 6.57 | 6.66 | 5.82 |
Energía Facturada (GWh) | 2.62 | 2.79 | 2.89 | 2.85 | 3.49 | 3.39 | 3.6 | 3.61 | 3.28 | 3.4 | 3.11 | 3.22 |
Energía Cobrada (GWh) | 3.23 | 2.28 | 2.66 | 3 | 3.21 | 3.89 | 2.86 | 3.24 | 3.36 | 3 | 3.08 | 3.02 |
% Servicio | 99.26% | 96.98% | 92.36% | 97.84% | 96.91% | 94.64% | 95.38% | 95.44% | 97.31% | 93.88% | 99.45% | 98.40% |
% Sin Servicio | 0.74% | 3.02% | 7.64% | 2.16% | 3.09% | 5.36% | 4.62% | 4.56% | 2.69% | 6.12% | 0.55% | 1.60% |
Interrupción Programada (Hrs) | 4.00 | 18.00 | 40.00 | 3.00 | 6.00 | 8.00 | 0.00 | 4.00 | 0.00 | 8.00 | 4.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 5.38 | 22.06 | 55.77 | 15.75 | 22.54 | 39.11 | 33.72 | 33.28 | 19.64 | 44.71 | 3.99 | 11.67 |
Promedio Interrupción Diarias (Hrs) | 0.18 | 0.73 | 1.83 | 0.52 | 0.74 | 1.29 | 1.11 | 1.09 | 0.65 | 1.47 | 0.13 | 0.38 |
Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.