Circuito GRBO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24
Clasificación C C C C C A B C C C A A
Clientes 17373 17373 17080 16868 16726 16480 16398 16354 16386 16374 16437 16447
% Nivel Cobranza 0.00% 97.66% 87.26% 97.36% 92.62% 94.51% 89.20% 87.96% 123.59% 81.78% 91.93% 105.21%
% Nivel Pérdida 0.00% 45.67% 48.45% 53.25% 54.51% 51.72% 55.93% 48.24% 59.02% 44.59% 47.55% 52.16%
Energía Suministrada (GWh) 0 6.97 7.56 7.85 7.39 6.94 6.94 6 6.39 5.04 5.51 5.95
Energía Facturada (GWh) 0 3.79 3.9 3.67 3.36 3.35 3.06 3.1 2.62 2.79 2.89 2.85
Energía Cobrada (GWh) 0 3.70 3.4 3.57 3.11 3.17 2.73 2.73 3.23 2.28 2.66 3
% Servicio 97.48% 97.90% 97.47% 96.03% 97.41% 98.51% 98.03% 97.09% 99.26% 96.98% 92.36% 97.84%
% Sin Servicio 2.52% 2.10% 2.53% 3.97% 2.59% 1.49% 1.97% 2.91% 0.74% 3.02% 7.64% 2.16%
Interrupción Programada (Hrs) 5.00 3.00 6.00 3.00 0.00 0.00 6.00 11.00 4.00 18.00 40.00 3.00
Interrupción Ejecutada (Hrs) 18.36 15.31 18.45 28.97 18.87 10.86 14.40 21.22 5.38 22.06 55.77 15.75
Promedio Interrupción Diarias (Hrs) 0.60 0.50 0.61 0.95 0.62 0.36 0.47 0.70 0.18 0.73 1.83 0.52
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.