Circuito GRBO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación C A B C C C A A A A A A
Clientes 16480 16480 16398 16354 16386 16374 16437 16447 16544 16568 16583 16590
% Nivel Cobranza 0.00% 94.51% 89.20% 87.96% 123.59% 81.78% 91.93% 105.21% 91.91% 114.69% 79.35% 89.67%
% Nivel Pérdida 0.00% 51.72% 55.93% 48.24% 59.02% 44.59% 47.55% 52.16% 37.79% 51.98% 45.41% 51.22%
Energía Suministrada (GWh) 0 6.94 6.94 6 6.39 5.04 5.51 5.95 5.61 7.07 6.6 7.41
Energía Facturada (GWh) 0 3.35 3.06 3.1 2.62 2.79 2.89 2.85 3.49 3.39 3.6 3.61
Energía Cobrada (GWh) 0 3.17 2.73 2.73 3.23 2.28 2.66 3 3.21 3.89 2.86 3.24
% Servicio 97.41% 98.51% 98.03% 97.09% 99.26% 96.98% 92.36% 97.84% 96.91% 94.64% 95.38% 95.44%
% Sin Servicio 2.59% 1.49% 1.97% 2.91% 0.74% 3.02% 7.64% 2.16% 3.09% 5.36% 4.62% 4.56%
Interrupción Programada (Hrs) 0.00 0.00 6.00 11.00 4.00 18.00 40.00 3.00 6.00 8.00 0.00 4.00
Interrupción Ejecutada (Hrs) 18.87 10.86 14.40 21.22 5.38 22.06 55.77 15.75 22.54 39.11 33.72 33.28
Promedio Interrupción Diarias (Hrs) 0.62 0.36 0.47 0.70 0.18 0.73 1.83 0.52 0.74 1.29 1.11 1.09
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.