Circuito GRBO103

Distribuidora EdeSur - Provincia San Cristóbal


Mes-Año Mar26 Feb26 Ene26 Dic25 Nov25 Oct25 Sep25 Ago25 Jul25 Jun25 May25 Abr25
Clasificación C C C C C C C C C A B C
Clientes 15139 15139 17414 17427 17427 17373 17080 16868 16726 16480 16398 16354
% Nivel Cobranza 0.00% 86.45% 93.87% 98.85% 88.92% 97.66% 87.26% 97.36% 92.62% 94.51% 89.20% 87.96%
% Nivel Pérdida 0.00% 45.42% 47.31% 46.63% 45.88% 45.67% 48.45% 53.25% 54.51% 51.72% 55.93% 48.24%
Energía Suministrada (GWh) 0 5.13 5.55 6 6.16 6.97 7.56 7.85 7.39 6.94 6.94 6
Energía Facturada (GWh) 0 2.80 2.93 3.20 3.34 3.79 3.9 3.67 3.36 3.35 3.06 3.1
Energía Cobrada (GWh) 0 2.42 2.75 3.16 2.96 3.70 3.4 3.57 3.11 3.17 2.73 2.73
% Servicio 96.89% 96.69% 97.97% 98.39% 97.48% 97.90% 97.47% 96.03% 97.41% 98.51% 98.03% 97.09%
% Sin Servicio 3.11% 3.31% 2.03% 1.61% 2.52% 2.10% 2.53% 3.97% 2.59% 1.49% 1.97% 2.91%
Interrupción Programada (Hrs) 10.00 5.00 5.00 5.00 5.00 3.00 6.00 3.00 0.00 0.00 6.00 11.00
Interrupción Ejecutada (Hrs) 22.39 23.80 14.64 11.97 18.36 15.31 18.45 28.97 18.87 10.86 14.40 21.22
Promedio Interrupción Diarias (Hrs) 0.74 0.78 0.48 0.39 0.60 0.50 0.61 0.95 0.62 0.36 0.47 0.70
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.