Circuito GALL114

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Sep26 Ago26 Jul26 Jun26 May26 Abr26 Mar26 Feb26 Ene26 Dic25 Nov25 Oct25
Clasificación A A A A A A A A A A A A
Clientes 6614 6614 6589 6589 6584 6567 6585 6585 6586 6570 6567 6547
% Nivel Cobranza 0.00% 91.24% 101.00% 87.99% 93.97% 86.94% 118.63% 93.16% 99.04% 110.80% 102.30% 106.35%
% Nivel Pérdida 0.00% 18.85% 22.71% 18.17% 25.86% 14.61% 23.54% 3.93% 12.77% 14.78% 3.24% 8.66%
Energía Suministrada (GWh) 0 5.06 4.86 4.55 4.28 3.52 3.46 3.18 3.5 3.69 3.64 4.16
Energía Facturada (GWh) 0 4.1 3.76 3.72 3.17 3 2.64 3.05 3.05 3.15 3.52 3.8
Energía Cobrada (GWh) 0 3.74 3.8 3.28 2.98 2.61 3.13 2.84 3.03 3.49 3.6 4.04
% Servicio 97.93% 99.05% 99.35% 100.00% 99.94% 99.89% 99.17% 98.11% 99.90% 99.88% 97.26% 99.69%
% Sin Servicio 2.07% 0.95% 0.65% 0.00% 0.06% 0.11% 0.83% 1.89% 0.10% 0.12% 2.74% 0.31%
Interrupción Programada (Hrs) 0.00 6.00 10.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00 0.00
Interrupción Ejecutada (Hrs) 14.87 6.87 4.68 0.00 0.40 0.79 5.96 13.60 0.75 0.93 19.99 2.28
Promedio Interrupción Diarias (Hrs) 0.49 0.23 0.15 0.00 0.01 0.03 0.20 0.45 0.02 0.03 0.66 0.07
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito GALL114
Interrupciones Programadas 0
Interrupciones Ejecutadas 0.08
% Ejecución Operativa 0%
Detalle de Salidas - Circuito GALL114
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
14/10/2026 Ejecutada 15:35:30 15:40:23 0.08 DISPARO DESCONOCIDO
Cerros De Gurabo, El Paraiso, Gurabo Abajo, Gurabo Al Medio, Hoya Del Caimito, Jacagua 4, La Cienaga 1, La Gallera, Los Jardines Metropolitanos, Monte Adentro, Reparto Consuelo, Reparto Del Este, Res. Henriquez, Res. Vista Loma, Urb. El Eden, Urb. El Manantial (Gurabo Abajo), Urb. Los Rios (Gurabo Abajo), Urb. Maynardi Reyna, Urb. Nonon Diaz (Gurabo Abajo), Villa Progreso, Villa Verde.