Circuito GALL113GUR

Distribuidora EdeNorte - Provincia Samana


Mes-Año Dic19 Nov19 Oct19 Sep19 Ago19 Jul19 Jun19 May19 Abr19 Mar19 Feb19 Ene19
Clasificación D D D D D D D D D D D D
Clientes 0 894 859 859 841 841 819 767 718 689 654 586
% Nivel Cobranza 76.40% 79.55% 96.62% 92.23% 97.65% 92.40% 89.35% 93.32% 102.54% 101.03% 93.71% 95.56%
% Nivel Pérdida 96.39% 24.35% 40.43% 42.52% 43.51% 42.79% 45.36% 50.86% 53.18% 53.55% 53.56% 56.55%
Energía Suministrada (GWh) 0.1 0.17 0.2 0.2 0.19 0.18 0.18 0.19 0.17 0.18 0.18 0.19
Energía Facturada (GWh) 0 0.13 0.12 0.11 0.11 0.11 0.1 0.09 0.08 0.08 0.09 0.08
Energía Cobrada (GWh) 0 0.11 0.11 0.1 0.11 0.1 0.09 0.09 0.08 0.08 0.08 0.08
% Servicio 0.00% 55.84% 60.67% 68.24% 53.50% 58.25% 55.50% 67.29% 52.17% 51.11% 71.74% 55.63%
% Sin Servicio 0.00% 44.16% 39.33% 31.76% 46.50% 41.75% 44.50% 32.71% 47.83% 48.89% 28.26% 44.37%
Interrupción Programada (Hrs) 0.00 334.00 299.00 233.00 312.00 337.00 360.00 270.55 360.00 372.00 318.00 360.00
Interrupción Ejecutada (Hrs) 0.00 322.38 287.12 231.88 339.47 304.76 324.87 238.79 349.19 356.92 206.27 323.88
Promedio Interrupción Diarias (Hrs) 0.00 10.60 9.44 7.62 11.16 10.02 10.68 7.85 11.48 11.73 6.78 10.65
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Cuesta la Piedra (Carretera Luperón), La Chichigua (Gurabo Arriba), Palo Quemado