Circuito GALL103CEJ

Distribuidora EdeNorte - Provincia Santiago


Mes-Año Sep13 Ago13 Jul13 Jun13 May13 Abr13 Mar13 Feb13 Ene13 Dic12 Nov12 Oct12
Clasificación D D D D D D D D D D D D
Clientes 791 791 783 752 755 756 761 763 761 793 814 814
% Nivel Cobranza 0.00% 85.66% 93.21% 88.79% 100.06% 89.02% 95.72% 80.70% 92.75% 89.00% 102.06% 89.60%
% Nivel Pérdida 0.00% 87.73% 88.25% 87.35% 87.76% 87.71% 88.17% 86.81% 87.63% 87.55% 87.16% 86.48%
Energía Suministrada (GWh) 0 0.86 0.83 0.79 0.81 0.78 0.78 0.69 0.72 0.74 0.69 0.74
Energía Facturada (GWh) 0 0.11 0.1 0.1 0.1 0.1 0.09 0.09 0.09 0.09 0.09 0.1
Energía Cobrada (GWh) 0 0.09 0.09 0.09 0.1 0.09 0.09 0.07 0.08 0.08 0.09 0.09
% Servicio 56.72% 57.37% 52.80% 59.50% 55.35% 69.06% 56.65% 67.96% 68.43% 79.81% 63.55% 62.47%
% Sin Servicio 43.28% 42.63% 47.20% 40.50% 44.65% 30.94% 43.35% 32.04% 31.57% 20.19% 36.45% 37.53%
Interrupción Programada (Hrs) 330.00 336.00 341.00 342.00 338.00 322.00 341.00 297.00 330.00 253.00 330.00 341.00
Interrupción Ejecutada (Hrs) 315.96 311.17 344.53 295.67 325.95 225.88 316.43 233.89 230.48 147.37 266.05 273.99
Promedio Interrupción Diarias (Hrs) 10.39 10.23 11.33 9.72 10.72 7.43 10.40 7.69 7.58 4.84 8.75 9.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Reporte de Ejecución - Circuito GALL103CEJ
Interrupciones Programadas 3
Interrupciones Ejecutadas 0
% Ejecución Operativa 0%
Detalle de Salidas - Circuito GALL103CEJ
Fecha Tipo Interrupción Hora Apertura Hora Cierre Duración Total Causa
01/03/2020 Programada 09:00:00 12:00:00 3
Calle 20 esq. Camino El Ejido