Circuito EMBA103

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24 Jul24 Jun24 May24 Abr24
Clasificación A A A A A A A A A A A A
Clientes 2154 2159 2153 2153 2154 2155 2156 2156 2155 2155 2155 2152
% Nivel Cobranza 92.00% 93.97% 111.35% 112.31% 105.93% 100.18% 85.43% 98.86% 99.81% 94.54% 101.65% 98.04%
% Nivel Pérdida 15.29% -0.94% 6.00% 5.86% -12.71% 9.16% 3.76% 11.82% 6.63% 7.16% 15.91% 9.45%
Energía Suministrada (GWh) 2.57 2.16 2.35 2.49 2.49 3.09 2.91 2.97 2.83 2.78 2.83 2.47
Energía Facturada (GWh) 2.18 2.18 2.21 2.34 2.8 2.8 2.8 2.62 2.65 2.58 2.38 2.24
Energía Cobrada (GWh) 2 2.04 2.46 2.63 2.97 2.81 2.39 2.59 2.64 2.44 2.42 2.19
% Servicio 99.97% 99.98% 98.91% 99.63% 99.46% 99.69% 99.93% 98.51% 98.71% 99.93% 99.99% 99.92%
% Sin Servicio 0.03% 0.02% 1.09% 0.37% 0.54% 0.31% 0.07% 1.49% 1.29% 0.07% 0.01% 0.08%
Interrupción Programada (Hrs) 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 3.00 3.00 0.00 0.00
Interrupción Ejecutada (Hrs) 0.22 0.12 7.96 2.71 3.96 2.27 0.54 10.86 9.42 0.50 0.08 0.56
Promedio Interrupción Diarias (Hrs) 0.01 0.00 0.26 0.09 0.13 0.07 0.02 0.36 0.31 0.02 0.00 0.02
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Bella Vista : Bohechio desde la Rómulo Betancourt hasta llegar a la Selene, Helios desde la Corozal hasta los Arrayanes, Selene desde la Central hasta la Higuemota, Av. Anacaona desde la Núñez de Caceres hasta el Callejón Selene, Núñez de Cáceres desde la Anacaona hasta llegar a la Rómulo Betancourt, Los Samanes, Nogales.