Circuito EMBA102

Distribuidora EdeSur - Provincia Distrito Nacional


Mes-Año Jul25 Jun25 May25 Abr25 Mar25 Feb25 Ene25 Dic24 Nov24 Oct24 Sep24 Ago24
Clasificación B A B B B B A A A A A A
Clientes 4417 4417 4417 4413 4413 4390 4384 4361 4360 4353 4335 4330
% Nivel Cobranza 0.00% 93.59% 99.13% 94.19% 104.88% 92.22% 107.56% 133.28% 94.64% 97.00% 81.37% 102.05%
% Nivel Pérdida 0.00% 10.73% 25.16% 5.05% 20.47% 3.26% 15.34% 5.09% -6.49% 13.84% 11.04% 11.57%
Energía Suministrada (GWh) 0 3.78 3.87 3.21 3.4 2.87 3.16 3.17 3.29 4.16 3.81 3.85
Energía Facturada (GWh) 0 3.37 2.89 3.04 2.7 2.78 2.68 3.01 3.51 3.58 3.39 3.4
Energía Cobrada (GWh) 0 3.16 2.87 2.87 2.84 2.56 2.88 4.01 3.32 3.47 2.76 3.47
% Servicio 99.67% 99.99% 99.66% 99.96% 99.23% 99.98% 99.44% 99.96% 99.77% 99.83% 99.46% 99.94%
% Sin Servicio 0.33% 0.01% 0.34% 0.04% 0.77% 0.02% 0.56% 0.04% 0.23% 0.17% 0.54% 0.06%
Interrupción Programada (Hrs) 0.00 0.00 3.00 0.00 3.00 0.00 7.00 1.00 0.00 0.00 0.00 0.00
Interrupción Ejecutada (Hrs) 2.38 0.07 2.47 0.26 5.64 0.11 4.07 0.27 1.70 1.24 3.92 0.42
Promedio Interrupción Diarias (Hrs) 0.08 0.00 0.08 0.01 0.19 0.00 0.13 0.01 0.06 0.04 0.13 0.01
Gráfico de Interrupciones

Una semana, a partir de la fecha indicada

Av. Bolívar desde la C/Dr. Defilló hasta la Abraham Lincoln, Bella Vista, Av. Jimenez Moya desde la 27 de Febrero hasta la Sarasota, Empresa de Transmisión Eléctrica Dominicana (ETED), Hotel Embajador, La Julia (parcial).