Circuito DPED105PAR
Distribuidora EdeNorte - Provincia Santiago
| Mes-Año | Jul26 | Jun26 | May26 | Abr26 |
|---|---|---|---|---|
| Clasificación | B | B | B | B |
| Clientes | 7581 | 7581 | 751 | 751 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 |
| % Servicio | 94.61% | 97.46% | 99.03% | 98.88% |
| % Sin Servicio | 5.39% | 2.54% | 0.97% | 1.12% |
| Interrupción Programada (Hrs) | 25.00 | 5.00 | 4.00 | 4.00 |
| Interrupción Ejecutada (Hrs) | 38.79 | 18.28 | 6.99 | 8.05 |
| Promedio Interrupción Diarias (Hrs) | 1.28 | 0.60 | 0.23 | 0.26 |
| Fecha | Tipo Interrupción | Hora Apertura | Hora Cierre | Duración Total | Causa |
|---|---|---|---|---|---|
| 18/08/2026 | Programada | 13:00:00 | 18:00:00 | 5 | |
| 13/08/2026 | Ejecutada | 19:26:44 | 19:32:52 | 2 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES |
| 13/08/2026 | Ejecutada | 15:18:05 | 17:06:39 | 2 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES |
| 13/08/2026 | Ejecutada | 12:00:37 | 12:05:49 | 2 | DISPARO DESCONOCIDO // FALLAS ETED, SOBRECARGA DE LINEA TRANSMISION // LÍNEAS LIGADAS REDES |
| 12/08/2026 | Ejecutada | 10:39:14 | 10:42:29 | 0.05 | INTERCONEXION DE PROYECTOS |